Workshop Manuals Factory service & repair Volkswagen
01 4 - Cyl. injection engine (1.0 l)02 5 - Speed manual gearbox 013 and 0CA03 Brake systems04 Running gear, axles, steering05 Running gear, axels, steering - GTI 16V06 Heating, air conditioning07 Electrical system08 Electrical: Communication09 General body repairs, interior10 General body repairs, exterior11 4 - Cyl. injection engine12 4-Cyl. injection engine (1.0 l, 2-valve, rocking rollers)13 4-cyl. injection engine (2-valve)14 4 - Cyl. diesel engine
Volkswagen Gol G3 with Parati and Saveiro, Brazil (1999-2005)14 · 4 - Cyl. diesel engine
14 · Engine

Installation - instructions

Make
Volkswagen
Model
Gol G3 with Parati and Saveiro, Brazil
Year
1999–2005
Section
Engine - remove and install › Installation - instructions
4 - Cyl. diesel engineInstallation - instructions

Installation - instructions

Chassis

Perform the operations described for the installation in the inverse order to those for the removal, taking into account the following:

Warning During the removal work, especially within the engine compartment, due to the lack of space, take the following into account:

  • All tubing (for example fuel feed, hydraulic, activated carbon filter system, cooling fluid and refrigerating gas, brake fluid, vacuum) and the electrical cables must be placed so that they return to their original positions.
  • Ensure easy access to movable parts or those that may be hot.

Check if the transmission assembly guides for centering the engine/transmission have been fitted to the engine block and, if necessary, fit them.

Fit the intermediate plate to the rear flange of the crankshaft onto the transmission assembly guides.

N10-0160

When the engine is inserted, check that there is sufficient space for the servicing drive shafts.

Perform the operations described for the installation in the inverse order to those for the removal, taking into account the following:

Check wear of the clutch roller bearing and, if necessary, replace it.

Lubricate lightly with Lubricating grease G 000 100 the clutch bearing, the bearing and primary bearing.

Check if the transmission assembly guides for centering the engine/transmission have been fitted to the engine block and, if necessary, fit them.

When the powerplant is inserted, check that there is sufficient space for the articulated shafts.

Align the engine with movements that ensure that the supports hold it without effort.

Install gearbox

Install the articulated shafts: ChassisRep. Gr.40Articulated shaft - remove and install

Install front exhaust pipe.

Install power steering oil pump ChassisRep. Gr.48Oil pump - remove and install

Install the transmission gearboxGearbox - repair: AP motor Rep. Gr.34Transmission - remove and install

Parts & tools for this job For 1999 Volkswagen Gol

As an Amazon Associate we earn from qualifying purchases.