Sequence of operations
- Make
- Volkswagen
- Model
- Gol G3 with Parati and Saveiro, Brazil
- Year
- 1999–2005
- Section
- Valve operating system - repair › Sequence of operations
Sequence of operations
Cylinder head removedRemove injectors. Chapter
Remove pre-heating plugs.
Remove turbulence chamber by striking it through the injector opening with a punch.
Remove combustion residues from the contact surface of the cylinder head combustion chambers.
Fit a new turbulence chamber. The installation position is shown by a groove and the guide lip.
Insert turbulence chamber with a plastic hammer.
Measure the protrusion of the turbulence chambers. Nominal value: 0.07 mm maximum

If the nominal value is exceeded:
Replace cylinder head.
Parts & tools for this job For 1999 Volkswagen Gol
- PARTEngine gasket setSearch: Volkswagen Gol 1999 engine gasket set
- TOOLTorque wrenchSearch: 3/8 inch torque wrench
- TOOLFeeler gauge setSearch: feeler gauge set
As an Amazon Associate we earn from qualifying purchases.