Workshop Manuals Factory service & repair Volkswagen
01 4 - Cyl. injection engine (1.0 l)02 5 - Speed manual gearbox 013 and 0CA03 Brake systems04 Running gear, axles, steering05 Running gear, axels, steering - GTI 16V06 Heating, air conditioning07 Electrical system08 Electrical: Communication09 General body repairs, interior10 General body repairs, exterior11 4 - Cyl. injection engine12 4-Cyl. injection engine (1.0 l, 2-valve, rocking rollers)13 4-cyl. injection engine (2-valve)14 4 - Cyl. diesel engine
Volkswagen Gol G3 with Parati and Saveiro, Brazil (1999-2005)11 · 4 - Cyl. injection engine
11 · Engine

Installing

Make
Volkswagen
Model
Gol G3 with Parati and Saveiro, Brazil
Year
1999–2005
Section
Cylinder head - disassemble and assemble › Installing
4 - Cyl. injection engineInstalling

Installing

Conditions

Pistons must not be at top dead center (TDC).The camshaft gears shall be blocked by retaining stems on the head to prevent their motion.Prevent dirt and sealant residues from coming into the engine cylinder head.The sealing surfaces must be free from grease and oil.

Eliminate sealant residues from head and cover with flat wedge.

Clean oil filter on the head (arrow).

N15-0334

Apply fine and even layer of sealant Chemical Materials Manual on the clean contact surface of the head cover (shadowed part of illustration).

N15-0333

Note

  • Do not apply a sealant layer too thick, because the excess quantity could reach the passages and galleries and cause severe damages to the engine.

Check that all roller rockers are correctly supported on the valve stem ends (1) and fastened on the respective support elements (2).

N15-0334

Check that the oil filter is installed (arrow).

Install 2 Studs M 6 x 70 on the head before installing head cover.

Install carefully the head cover on the head without tilting it, using studs as guides (arrows).

N15-0386

Tighten evenly the new fastening screws on the head cover, alternately and in cross pattern, from center to ends, to 10 Nm + 90°.

Note

  • After installing the head cover, wait 30 minutes for sealant drying.

Resume installation in reverse removal sequence.

Parts & tools for this job For 1999 Volkswagen Gol

As an Amazon Associate we earn from qualifying purchases.