Operation sequence
- Make
- Volkswagen
- Model
- Gol G3 with Parati and Saveiro, Brazil
- Year
- 1999–2005
- Section
- Engine control unit J623 › Operation sequence
4 - Cyl. injection engineOperation sequence
Operation sequence
Connect the Vehicle Diagnosis, Measurement and Information System VAS 5051A/52 as follows:
Connect Diagnosis cable (3 m) VAS 5051/5 or Diagnosis cable (3 m) VAS 5051/1 connector to the diagnostic connector.


Start the engine, and let it operating at idle speed.
Only if the engine does not start:
Turn the ignition on.
Parts & tools for this job For 1999 Volkswagen Gol
- PARTEngine gasket setSearch: Volkswagen Gol 1999 engine gasket set
- TOOLTorque wrenchSearch: 3/8 inch torque wrench
- TOOLFeeler gauge setSearch: feeler gauge set
As an Amazon Associate we earn from qualifying purchases.