Workshop Manuals Factory service & repair Volkswagen
01 4 - Cyl. injection engine (1.0 l)02 5 - Speed manual gearbox 013 and 0CA03 Brake systems04 Running gear, axles, steering05 Running gear, axels, steering - GTI 16V06 Heating, air conditioning07 Electrical system08 Electrical: Communication09 General body repairs, interior10 General body repairs, exterior11 4 - Cyl. injection engine12 4-Cyl. injection engine (1.0 l, 2-valve, rocking rollers)13 4-cyl. injection engine (2-valve)14 4 - Cyl. diesel engine
Volkswagen Gol G3 with Parati and Saveiro, Brazil (1999-2005)11 · 4 - Cyl. injection engine
11 · Engine

Checking process

Make
Volkswagen
Model
Gol G3 with Parati and Saveiro, Brazil
Year
1999–2005
Section
Lubrication system components - remove and install › Checking process
4 - Cyl. injection engineChecking process

Checking process

Remove the pump cover.

Check for signs of wear and grind it, if necessary (use sandpaper on a flat surface).

Remove the pump drive shaft and gear.

Clean the parts and dry with compressed air.

Lubricate and install the drive shaft and gear in the pump body.

Measure the play between the sides of the gear teeth.

V17-0005

Note

  • Clearance: 0.05 mm
  • Wear limit: 0.20 mm

Measure the axial clearance of the gears.

V17-0006

Note

  • Wear limit: 0.15 mm.

Lubricate the gears by using the engine oil itself.

Remove the pump cover.

Fasten suction tube.

Position and install the pump on the block.

Install crankcase → Chapter.

Fill lubrication system.

Parts & tools for this job For 1999 Volkswagen Gol

As an Amazon Associate we earn from qualifying purchases.