Test sequence
- Make
- Volkswagen
- Model
- Gol G3 with Parati and Saveiro, Brazil
- Year
- 1999–2005
- Section
- Camshaft - service › Test sequence
4-cyl. injection engine (2-valve)Test sequence
Test sequence
Install a new valve with guide. The end of the valve stem must be leveled with the guide.

Diameter of the valve guide: from 7.000...7.015 mm.
Measure the folding clearance. Wear limit: admission... 1.00 mm. Wear limit: exhaust... 1.30 mm.
In case the clearance is surpassed:
Replace engine cylinder head.
Parts & tools for this job For 1999 Volkswagen Gol
- PARTEngine gasket setSearch: Volkswagen Gol 1999 engine gasket set
- TOOLTorque wrenchSearch: 3/8 inch torque wrench
- TOOLFeeler gauge setSearch: feeler gauge set
As an Amazon Associate we earn from qualifying purchases.