Workshop Manuals Factory service & repair Volkswagen
01 4 - Cyl. injection engine (1.0 l)02 5 - Speed manual gearbox 013 and 0CA03 Brake systems04 Running gear, axles, steering05 Running gear, axels, steering - GTI 16V06 Heating, air conditioning07 Electrical system08 Electrical: Communication09 General body repairs, interior10 General body repairs, exterior11 4 - Cyl. injection engine12 4-Cyl. injection engine (1.0 l, 2-valve, rocking rollers)13 4-cyl. injection engine (2-valve)14 4 - Cyl. diesel engine
Volkswagen Gol G3 with Parati and Saveiro, Brazil (1999-2005)13 · 4-cyl. injection engine (2-valve)
13 · Engine

Checking procedure

Make
Volkswagen
Model
Gol G3 with Parati and Saveiro, Brazil
Year
1999–2005
Section
Ignition system repair › Checking procedure
4-cyl. injection engine (2-valve)Checking procedure

Checking procedure

Disconnect the Fitting bridge (TV23) -3- from the 2 contact connector and check for proper contact: Resistance: zero ω.

R24-0106

When specification is met:

Check voltage at the harness connector Theoretical value: 10V, with ignition on.

When specification is not met:

Connect the adapter cable V.A.G 1598/18 to the control unit harness connector.

R24-0107

Measure for proper contact between the cable and the check unit, according to electric circuit chart:

Theoretical value: zero ω.

When specification is not met:

Replace harness.

Parts & tools for this job For 1999 Volkswagen Gol

As an Amazon Associate we earn from qualifying purchases.