Workshop Manuals Factory service & repair Volkswagen
01 4 - Cyl. injection engine (1.0 l)02 5 - Speed manual gearbox 013 and 0CA03 Brake systems04 Running gear, axles, steering05 Running gear, axels, steering - GTI 16V06 Heating, air conditioning07 Electrical system08 Electrical: Communication09 General body repairs, interior10 General body repairs, exterior11 4 - Cyl. injection engine12 4-Cyl. injection engine (1.0 l, 2-valve, rocking rollers)13 4-cyl. injection engine (2-valve)14 4 - Cyl. diesel engine
Volkswagen Gol G3 with Parati and Saveiro, Brazil (1999-2005)06 · Heating, air conditioning
06 · Heating & A/C

Removal

Make
Volkswagen
Model
Gol G3 with Parati and Saveiro, Brazil
Year
1999–2005
Section
Plenum chamber (ventilation and heating) - remove and install › Removal
Heating, air conditioningRemoval

Removal

General body repairs, interior

Warning Risk of burns!
With hot engine, the coolant temperature may be over 100°C. The cooling system is pressurized.
Before starting any work, reduce pressure and temperature, if required.

Remove the dash panel General body repairs, interiorRep. gr.70Lining / insulation.

Close the coolant hoses in engine compartment by using the Clamps (diam. 25 mm) 3094

N80-0373

Release the hoses of the heating system in the engine compartment (if available).

R80-0030

Remove the generator Electrical systemRep. gr.27Starter, alternator, battery.

Remove the ventilation cover by releasing the clamps (arrows).

R80-10160

Remove the fastening lock (1) of the air intake housing.

Remove the air intake housing (2).

R80-10161

Release the screws in the air intake region with an Articulated T wrench - 13 mm VW 126B.

R87-10121

Release the plenum chamber fastenings in the engine compartment.

Remove the plenum chamber.

Parts & tools for this job For 1999 Volkswagen Gol

As an Amazon Associate we earn from qualifying purchases.