Workshop Manuals Factory service & repair Volkswagen
01 4 - Cyl. injection engine (1.0 l)02 4 - Cyl. injection engine03 5 - Speed manual gearbox 013 and 0CA04 Brake systems05 Running gear, axles, steering06 Wheels and Tyres - Specifications07 Heating, air conditioning08 Electrical system09 Electrical: Communication10 General body repairs, interior11 General body repairs, exterior12 4-cyl. injection engine (2-valve)13 4 - Cyl. diesel engine
Volkswagen Gol G4 with Parati and Saveiro, Brazil (2005-2014)13 · 4 - Cyl. diesel engine
13 · Engine

Sequence of operations

Make
Volkswagen
Model
Gol G4 with Parati and Saveiro, Brazil
Year
2005–2014
Section
Fuel injection system - repair › Sequence of operations
4 - Cyl. diesel engineSequence of operations

Sequence of operations

Connect the Vehicle diagnosis, measurement and information system VAS 5051 or V.A.S 5052 as follows:

Connect the connector of the Diagnostic cable VAS 5051/5A or VAS 5051/6A to the diagnostic connector.

R24-0087

Turn the engine on and let it idle.

On the screen, press the button relative to “Auto-diagnostic”.

On the screen, press key “41 - Injection pump electronics”.

The screen shows the identification of the command units and the codification of the injection pump command unit.

On the screen, press “ 08 - read block of measurement values”.

Check block 1.

Observe the indication in indication field 1.

Parts & tools for this job For 2005 Volkswagen Gol

As an Amazon Associate we earn from qualifying purchases.