Workshop Manuals Factory service & repair Volkswagen
01 4 - Cyl. injection engine (1.0 l)02 4 - Cyl. injection engine03 5 - Speed manual gearbox 013 and 0CA04 Brake systems05 Running gear, axles, steering06 Wheels and Tyres - Specifications07 Heating, air conditioning08 Electrical system09 Electrical: Communication10 General body repairs, interior11 General body repairs, exterior12 4-cyl. injection engine (2-valve)13 4 - Cyl. diesel engine
Volkswagen Gol G4 with Parati and Saveiro, Brazil (2005-2014)13 · 4 - Cyl. diesel engine
13 · Engine

Sequence of operations

Make
Volkswagen
Model
Gol G4 with Parati and Saveiro, Brazil
Year
2005–2014
Section
Valve operating system - repair › Sequence of operations
4 - Cyl. diesel engineSequence of operations

Sequence of operations

Cylinder head removed

Remove injectors. Chapter

Remove pre-heating plugs.

Remove turbulence chamber by striking it through the injector opening with a punch.

Remove combustion residues from the contact surface of the cylinder head combustion chambers.

Fit a new turbulence chamber. The installation position is shown by a groove and the guide lip.

Insert turbulence chamber with a plastic hammer.

Measure the protrusion of the turbulence chambers. Nominal value: 0.07 mm maximum

V13-1265

If the nominal value is exceeded:

Replace cylinder head.

Parts & tools for this job For 2005 Volkswagen Gol

As an Amazon Associate we earn from qualifying purchases.