Workshop Manuals Factory service & repair Volkswagen
01 4 - Cyl. injection engine (1.0 l)02 4 - Cyl. injection engine03 5 - Speed manual gearbox 013 and 0CA04 Brake systems05 Running gear, axles, steering06 Wheels and Tyres - Specifications07 Heating, air conditioning08 Electrical system09 Electrical: Communication10 General body repairs, interior11 General body repairs, exterior12 4-cyl. injection engine (2-valve)13 4 - Cyl. diesel engine
Volkswagen Gol G4 with Parati and Saveiro, Brazil (2005-2014)02 · 4 - Cyl. injection engine
02 · Engine

Checking process

Make
Volkswagen
Model
Gol G4 with Parati and Saveiro, Brazil
Year
2005–2014
Section
Lubrication system components - remove and install › Checking process
4 - Cyl. injection engineChecking process

Checking process

Remove pump cover.

Check for wear, then grind, if necessary (use sandpaper on a flat surface).

Remove pump drive shaft and gear.

Clean parts and dry using compressed air.

Lubricate and install the drive shaft and gear in pump body.

Using a Feeler gauge, measure the clearance between the flanges:

V17-0005

Note

  • Clearance: 0.05 mm.
  • Wear limit: 0.20 mm.

Measure the axial clearance of the gears.

V17-0006

Note

  • Wear limit: 0.15 mm.

Lubricate gears using the engine oil itself.

Remove pump cover.

Fasten suction tube.

Position and install the pump onto block.

Install crankcase → Chapter.

Fill lubrication system.

Parts & tools for this job For 2005 Volkswagen Gol

As an Amazon Associate we earn from qualifying purchases.