Installation
- Make
- Volkswagen
- Model
- Gol G4 with Parati and Saveiro, Brazil
- Year
- 2005–2014
- Section
- Starting motor › Installation
Electrical systemInstallation
Installation
Installation is performed in reverse sequence to the removal, considering the following:
Note
- Check the condition of the bushing located in transmission body as it is essential for the Starter B good performance.
- Information about the Starter B bushing change procedure can be found in Clutch and TransmissionRep. gr.34Starter Bushing - Change
- Before putting Starter B in its housing, clean and lubricate bushing.
- Apply Lithium Lubricant G 052 150 A2 when assembling Starter B axis. See Chemical Materials Manual.
Tighten the securing bolt and nut for the Starter B with the specified tightening torque → Chapter.
Parts & tools for this job For 2005 Volkswagen Gol
- TOOLDigital multimeterSearch: automotive digital multimeter
- PARTAssorted fuse kitSearch: car fuse assortment kit
- TOOLWire crimper and connector kitSearch: wire crimper connector kit
As an Amazon Associate we earn from qualifying purchases.