Workshop Manuals Factory service & repair Volkswagen
01 4 - Cyl. injection engine (1.6 l)02 Troubleshooting, Mechanical Transmission03 5 - Speed manual gearbox (0AP, 02T)04 5 - Speed automated transmission (ASG) 0C305 Brake systems06 Running gear, axles, steering07 Wheels and Tyres - Specifications08 Heating, air conditioning09 Electrical system10 Electrical: Communication11 General body repairs, interior12 General body repairs, exterior
Volkswagen Gol G5 with Voyage and Saveiro, Brazil (2008-2012)08 · Heating, air conditioning
08 · Heating & A/C

Removal

Make
Volkswagen
Model
Gol G5 with Voyage and Saveiro, Brazil
Year
2008–2012
Section
Refrigerant circuit - assembly overview › Removal
Heating, air conditioningRemoval

Removal

Electrical equipment

Remove horn Electrical equipmentRep. gr.96Internal lights and lamps, switches, anti-theft protection

Remove engine lower noise insulation General body repairs, exteriorRep. gr.50Body - Front section.

Remove right front wheel case cover Body - External assembly workRep. gr.66External equipment.

Remove Poly-V belt Cylinder injection engine (1.0l)Rep. gr.13Engine - mech. crankshaft, plungers.

Disconnect the connector for the Air conditioning magnetic clutch N25harness.

Install tool EQ 7112

In order to perform this operation, the tool must be positioned in an angle so that the brake (1) touches the clutch and the belt (2) and has contact both with the clutch and the set pulley.

R87-10164

Loosen the securing bolt (1) in the direction of the (arrow) and simultaneously move the Poly-V Pulley locking rod EQ 7112 clockwise as indicated by the (arrow) in order to remove the coupling disc.

R87-10168

Note

  • Be careful not to lose the adjusting washers while removing the coupling disc.

Remove the lock ring (1).

R87-10165

Remove the circlips (1) and (2) and remove the Air conditioning magnetic clutch N25(3).

R87-10166

Parts & tools for this job For 2008 Volkswagen Gol

As an Amazon Associate we earn from qualifying purchases.