Workshop Manuals Factory service & repair Volkswagen
01 4 - Cyl. injection engine (1.6 l)02 Troubleshooting, Mechanical Transmission03 5 - Speed manual gearbox (0AP, 02T)04 5 - Speed automated transmission (ASG) 0C305 Brake systems06 Running gear, axles, steering07 Wheels and Tyres - Specifications08 Heating, air conditioning09 Electrical system10 Electrical: Communication11 General body repairs, interior12 General body repairs, exterior
Volkswagen Gol G5 with Voyage and Saveiro, Brazil (2008-2012)02 · Troubleshooting, Mechanical Transmission
02 · Transmission

Welding

Make
Volkswagen
Model
Gol G5 with Voyage and Saveiro, Brazil
Year
2008–2012
Section
Complaints related to the selection mechanism › Welding
Troubleshooting, Mechanical TransmissionWelding

Welding

Note

  • Welding spots RP - spot seam (one row) shall be performed in the centre of the area indicated to welding.
  • The rigidity of the set is determined by the weld disposition.
N51-11077

Apply adhesive on the sticking area. 2 beads with ∅ 3.5 mm.

R53-0060

Note

  • The new part shall be welded within 30 minutes; otherwise, the adhesive action is nullified.

Place the material itself behind the separation cuts.

Adjust and fasten the new part with the vehicle on its wheels or on the alignment platform.

Check the adjustment with doors, tail lights and rear door.

R53-0061

Weld side panel, RP - spot seam (one row) and SG - hole fulfilment seam.

Weld cuts, SG - backstitch seam.

Weld the side panel to the rear door cut and to the tail light housing, SG - hole fulfilment seam.

R53-0062

Contour the wheel area flange.

Clean the adhesive that came out and seal the wheel area.

Note

  • Before welding, on the right side panel you must apply the butyl sealing cord on the fuel reservoir filling nozzle area.

Parts & tools for this job For 2008 Volkswagen Gol

As an Amazon Associate we earn from qualifying purchases.