Installation
- Make
- Volkswagen
- Model
- Gol G6 with Voyage and Saveiro, Brazil
- Year
- 2012–2016
- Section
- Plenum chamber (heating) - remove and install › Installation
Installation
Installation is performed in reverse sequence to the removal, observing the following:
Mount harnesses and all the connectors in their original positions.
Observe seal installation position (1) and heat exchanger hose position → Chapter.

Note
- After removal or replacement of heat exchanger, the cooling system will have air; to remove the air, proceed as follows:
Start the engine and keep it at 2500 rpm speed until coolant level in tank lowers due to opening of thermostat valve (the air that was in the heat exchanger is moved to the coolant tank , causing coolant level there to decrease).
Replenish the coolant tank level EngineRep. gr.19Cooling system.
Parts & tools for this job For 2012 Volkswagen Gol
- TOOLA/C manifold gauge setSearch: AC manifold gauge set
- TOOLUV leak detection kitSearch: AC UV leak detection kit
- PARTCabin filterSearch: Volkswagen Gol 2012 cabin filter
As an Amazon Associate we earn from qualifying purchases.