Workshop Manuals Factory service & repair Volkswagen
01 4-cyl. direct injection engine (1.8 l and 2.0 l 4V turbocharger, chain drive)02 4-cylinder injection engine (1.4 l direct injection engine, turbocharger)03 4-cylinder common rail engine (2.0 l, EA189 Gen II)04 4-cylinder injection engine (1.4 l direct injection engine, turbocharger and supercharger)05 4-cylinder direct injection engine (1.2 l engine, 2V, EA 111 turbocharger)06 4-cylinder common rail engine (1.6 l, EA189)07 4-cylinder injection engine (2.0 l engine, turbocharger) Volkswagen R GmbH08 4-cyl. direct injection engine (2.0 l, 4V, turbocharger, chain drive, generation III)09 4-cylinder common rail engine (2.0 l, 4V, turbo, EA288)10 Fuel supply system - Petrol engines11 Fuel supply system - Diesel engines12 4-cylinder direct-injection engine (1.2 l, 4V, EA 211, turbocharger)13 7-speed dual clutch gearbox 0AM14 6-speed manual gearbox 02Q, 0BB and 0FB15 6-speed dual clutch gearbox 02E16 6-speed manual gearbox 02S17 6-speed dual clutch gearbox 02E Volkswagen R GmbH18 6-speed manual gearbox 0AJ19 5-speed manual gearbox 0A420 Running gear, axles, steering21 Brake system22 Wheels and Tyres Guide23 Heating and air conditioning: Auxiliary heater24 Heating, air conditioning25 Electrical system26 Electrical: Communication27 General body repairs, interior28 General body repairs, exterior29 Vehicle-specific paint information
Volkswagen Golf Mk6 Cabriolet (2011-2016)28 · General body repairs, exterior
28 · Body & interior

Minimum curing period

Make
Volkswagen
Model
Golf Mk6 Cabriolet
Year
2011–2016
Section
Flush bonded windows › Minimum curing period
General body repairs, exteriorMinimum curing period

Minimum curing period

Warning Special standards must be adhered to when replacing bonded windows. One of these standards is, for example, that a freshly bonded windscreen must comply with the safety requirements, even in an accident, following the minimum prescribed curing period.

The minimum curing period for 2-pack adhesive is 2 hours for all windows.

Minimum curing period is the time from bonding the window until vehicle may be used. During this time, the vehicle must stand on a level surface at room temperature (at least 15°C).

Warning Vehicle is safe to use only after the curing period is completed.

Parts & tools for this job For 2011 Volkswagen Golf

As an Amazon Associate we earn from qualifying purchases.