Minimum curing period
- Make
- Volkswagen
- Model
- Golf Mk6 Cabriolet
- Year
- 2011–2016
- Section
- Spoiler › Minimum curing period
General body repairs, exteriorMinimum curing period
Minimum curing period
The minimum curing period for newly bonded attaching parts is 3 hours.
The minimum curing time is the time from bonding the add-on parts until the vehicle may be used. During this time, the vehicle must stand on a level surface at room temperature (at least 15-20 ℃).
Warning It is safe to use vehicle only after the curing period is completed.
Parts & tools for this job For 2011 Volkswagen Golf
- TOOLTrim removal tool kitSearch: trim removal tool kit
- PARTTouch-up paintSearch: Volkswagen touch up paint
- PARTPanel clip assortmentSearch: Volkswagen panel clips assortment
As an Amazon Associate we earn from qualifying purchases.