Workshop Manuals Factory service & repair Volkswagen
01 4-cylinder injection engine (1.6 l roller rocker finger)02 4-cylinder diesel engine (2.0 l engine, 2-valve, TDI)03 4-cylinder injection engine (1.4 l direct injection engine, turbocharger and supercharger)04 4-cylinder injection engine (1.4 l direct injection engine, turbocharger)05 5-cylinder injection engine (2.5 l engine, 4-valve)06 4-cylinder diesel engine with unit injector07 4-cylinder injection engine (2.0 l turbocharger)08 4-cylinder injection engine (1.4 l engine)09 4-cylinder injection engine (2.0 l engine, chain drive)10 4-cylinder diesel engine (2.0 l engine, common rail)11 4-cylinder diesel engine (2.0 l engine, 4 valve)12 5-speed manual gearbox 0AF13 6-speed automatic gearbox 09G14 5-speed manual gearbox 0A415 6-speed dual clutch gearbox 02E16 6-speed manual gearbox 02Q17 6-speed manual gearbox 02S18 7-speed dual clutch gearbox 0AM19 Propshaft and rear final drive20 6-speed manual gearbox 0AJ21 Running gear, axles, steering22 Brake systems23 Heating, air conditioning24 Heating and air conditioning: Auxiliary heater25 Electrical System, General Information26 Electrical: Communication27 Electrical system28 General body repairs, exterior29 General body repairs, interior
Volkswagen Golf Mk5 Estate (2007-2009)02 · 4-cylinder diesel engine (2.0 l engine, 2-valve, TDI)
02 · Engine

Installing

Make
Volkswagen
Model
Golf Mk5 Estate
Year
2007–2009
Section
Cylinder head › Installing
4-cylinder diesel engine (2.0 l engine, 2-valve, TDI)Installing

Installing

Note

  • Always renew cylinder head bolts.
  • In cases of repair carefully remove gasket remains from cylinder head and cylinder block. Ensure that no long scores or scratches are made on the surfaces. When using abrasive paper do not use a grade less than 100.
  • Carefully remove remains of emery and abrasives.
  • Do not remove new cylinder head gasket from packaging until it is ready to be fitted.
  • Handle gasket very carefully. Damage to the silicone coating or the indented area will lead to leaks.

Turn crankshaft to TDC marking before fitting cylinder head.

Turn crankshaft opposite engine direction of rotation until all pistons are approximately equally placed below TDC.

Fit cylinder head gasket.

Note

  • Note identification on cylinder head gasket → Fig..

Fit cylinder head and tighten all cylinder head bolts hand-tight.

Tighten cylinder head in four stages in sequence as shown as follows:

V15-0738
Tighten initially with torque wrench:Stage I = 35 NmStage II = 60 NmTurn further with rigid spanner:Stage III = 1/4 turn (90°)Stage IV = 1/4 turn (90°)

Note

  • After repair work it is not necessary to retighten the cylinder head bolts.

Further installation is carried out in the reverse order. When doing this, note the following:

After tightening cylinder head, turn camshaft so that cams for No. 1 cylinder point equally upwards. Turn crankshaft, in engine direction of rotation, to TDC marking before fitting toothed belt → Chapter.

A15-0530

Observe applicable safety precautions during road test → Chapter.

Carry out road test and then read fault memory → Chapter.

Parts & tools for this job For 2007 Volkswagen Golf

As an Amazon Associate we earn from qualifying purchases.