Workshop Manuals Factory service & repair Volkswagen
01 4-cylinder diesel engine (2.0 l engine, common rail, generation II)02 4-cylinder diesel engine (1.6 l engine, common rail)03 4-cylinder injection engine (1.6 l roller rocker finger)04 4-cylinder injection engine (1.4 l direct injection engine, turbocharger and supercharger)05 4-cylinder injection engine (1.4 l direct injection engine, turbocharger)06 5-cylinder injection engine (2.5 l engine, 4-valve)07 4-cylinder injection engine (1.4 l engine)08 4-cylinder injection engine (2.0 l engine, chain drive)09 4-cylinder diesel engine (2.0 l engine, common rail)10 4-cylinder injection engine (1.2 l direct injection engine, turbocharger)11 5-speed manual gearbox 0AF12 6-speed automatic gearbox 09G13 5-speed manual gearbox 0A414 6-speed dual clutch gearbox 02E15 6-speed manual gearbox 02Q16 6-speed manual gearbox 02S17 7-speed dual clutch gearbox 0AM18 Propshaft and rear final drive19 6-speed manual gearbox 0AJ20 5-speed manual gearbox 0AH21 Wheels and Tyres Guide - Standard22 Wheels and Tyres Guide23 Brake systems24 Running gear, axles, steering25 Heating, air conditioning26 Heating and air conditioning: Auxiliary heater27 Electrical System, General Information28 Electrical: Communication29 Electrical system30 General body repairs, interior31 General body repairs, exterior
Volkswagen Golf Mk6 Estate (2009-2013)02 · 4-cylinder diesel engine (1.6 l engine, common rail)
02 · Engine

Installing

Make
Volkswagen
Model
Golf Mk6 Estate
Year
2009–2013
Section
Cylinder head › Installing
4-cylinder diesel engine (1.6 l engine, common rail)Installing

Installing

Warning Avoid damage to sealing surfaces:

  • Carefully remove sealant residue from cylinder head and cylinder block.
  • Ensure that no long scores or scratches are made on the surfaces.
Avoid damage to cylinder block:
  • No oil or coolant must be allowed to remain in the blind holes for the cylinder head bolts in the cylinder block.
Ensure that cylinder head gasket seals properly:
  • Carefully remove remains of emery and abrasives.
  • Do not remove new cylinder head gasket from packaging until it is ready to be fitted.
  • Handle the cylinder head gasket very carefully to prevent damage to the silicone coating or the indented area of the gasket.
Avoid damage to open valves:
  • When installing an exchange cylinder head, the plastic protectors fitted to protect the open valves should not be removed until the cylinder head is ready to be fitted.
Avoid damage to valves and piston crowns after working on valve gear:
  • Turn the engine carefully at least 2 rotations to ensure that none of the valves make contact when the starter is operated.
  • Before installing, check whether decoupling element of oil return pipe is bent and thus stretched. If this is the case, micro cracks may have formed, the consequence of which would be leaks. If necessary, renew oil return pipes before installing the cylinder head.

Note

  • Always renew cylinder head bolts.
  • Renew seals, gaskets and self-locking nuts and securing clamps
  • In cases of repair carefully remove gasket remains from cylinder head and cylinder block. Ensure that no long scores or scratches are made on the surfaces. When using abrasive paper do not use a grade less than 100.
  • Carefully remove emery and abrasive remains.
  • Do not remove new cylinder head gasket from packaging until it is ready to be fitted.

Before fitting cylinder head, remove crankshaft stop T10050 and turn crankshaft opposite direction of rotation until all pistons are nearly uniformly below TDC.

Cylinder head gasket must lie with identification facing upwards.

Note

  • Exercise extreme caution. Ask a second mechanic for assistance.
  • Guide the cylinder head in the timing belt guard. When doing this, the cylinder head must not scrape over the dowel sleeves.

To centre, place the cylinder head carefully on the dowel sleeves (A).

N15-10530

Note

  • Tensioning roller must be pushed onto studs when fitting cylinder head.

Fit cylinder head, install 10 cylinder head bolts and hand-tighten.

Tighten cylinder head in 4 stages in sequence shown as follows:

V15-0738
Tighten initially with torque wrench:Stage I = 35 NmStage II = 60 NmTurn further with rigid spanner:Stage III = 1/4 turn (90°)Stage IV = 1/4 turn (90°)

Secure toothed belt rear guard to cylinder head.

Install hub and camshaft pulley.

Lock camshaft and high-pressure pump with diesel injection pump locking pin 3359

Now rotate crankshaft in direction of rotation to TDC and lock crankshaft using crankshaft stop T10050.

N15-0446

Further installation is carried out in the reverse order. In the process, note the following:

Reinstall toothed belt → Chapter.

Install cylinder head cover → Chapter.

Install oil supply line and turbocharger support → Chapter.

Install poly V-belt → Chapter.

Replenish coolant → Chapter.

Top up engine oil → Chapter.

After any work on the fuel system

Connect a diagnosis tester.

Perform the function “Filling/bleeding high pressure pump/fuel system” in “Guided functions”Chapter.

Carry out road test and read all fault memories.

Parts & tools for this job For 2009 Volkswagen Golf

As an Amazon Associate we earn from qualifying purchases.