Workshop Manuals Factory service & repair Volkswagen
01 4-cylinder diesel engine (2.0 l engine, common rail, generation II)02 4-cylinder diesel engine (1.6 l engine, common rail)03 4-cylinder injection engine (1.6 l roller rocker finger)04 4-cylinder injection engine (1.4 l direct injection engine, turbocharger and supercharger)05 4-cylinder injection engine (1.4 l direct injection engine, turbocharger)06 5-cylinder injection engine (2.5 l engine, 4-valve)07 4-cylinder injection engine (1.4 l engine)08 4-cylinder injection engine (2.0 l engine, chain drive)09 4-cylinder diesel engine (2.0 l engine, common rail)10 4-cylinder injection engine (1.2 l direct injection engine, turbocharger)11 5-speed manual gearbox 0AF12 6-speed automatic gearbox 09G13 5-speed manual gearbox 0A414 6-speed dual clutch gearbox 02E15 6-speed manual gearbox 02Q16 6-speed manual gearbox 02S17 7-speed dual clutch gearbox 0AM18 Propshaft and rear final drive19 6-speed manual gearbox 0AJ20 5-speed manual gearbox 0AH21 Wheels and Tyres Guide - Standard22 Wheels and Tyres Guide23 Brake systems24 Running gear, axles, steering25 Heating, air conditioning26 Heating and air conditioning: Auxiliary heater27 Electrical System, General Information28 Electrical: Communication29 Electrical system30 General body repairs, interior31 General body repairs, exterior
Volkswagen Golf Mk6 Estate (2009-2013)31 · General body repairs, exterior
31 · Body & interior

Minimum curing period

Make
Volkswagen
Model
Golf Mk6 Estate
Year
2009–2013
Section
Flush bonded windows › Minimum curing period
General body repairs, exteriorMinimum curing period

Minimum curing period

Warning Special standards must be adhered to when replacing bonded windows. One of these standards is, for example, that a freshly bonded windscreen must comply with the safety requirements, even in an accident, following the minimum prescribed curing period.

The minimum curing period for 2-pack adhesive is 2 hours for all windows.

The minimum curing period for 1-pack adhesive is three hours for all windows.

Minimum curing period is the time from bonding the window until vehicle may be used. During this time, the vehicle must stand on a level surface at room temperature (at least 15 °C).

Warning Vehicle is safe to use only after the curing period is completed.

Parts & tools for this job For 2009 Volkswagen Golf

As an Amazon Associate we earn from qualifying purchases.