–
| Tension toothed belt. To do this, turn pin wrench -T10020- on eccentric to left -in direction of arrow- onto stop. |
–
| Then reduce tension on toothed belt until notch -1- and indicator -2- align (use mirror). |
–
| Tighten securing nut to 20 Nm. |
–
| Turn crankshaft two full revolutions in direction of engine rotation until engine is again at TDC No. 1 cylinder. It is important that the last 45° of rotation (1/8 turn) is performed without interruption. |
–
| Check belt tension again. Specification: indicator and notch align. |
Continuation, fully installing toothed belt: |
–
| Install centre and lower toothed belt guard. |
–
| Install vibration damper/belt pulley, torque setting: 25 Nm |
–
| Fit engine mounting bracket to cylinder block. Torque setting: 45 Nm. |
–
| Install engine mounting complete. |
Note Before installing engine mounting insert bolts into mounting. |
–
| Align engine and gearbox mountings → Chapter. |
–
| Remove frame -10 - 222 A /1-. |
–
| Install upper toothed belt guard. |
–
| Install poly V-belt tensioning element. Torque setting: 25 Nm. |
–
| Install coolant expansion tank. |
–
| Install power steering reservoir. |
|
|
|