Assembly overview - turbocharger |

Note t
| All hose connections are secured. |
t
| Charge air system must be free of leaks. |
t
| Renew self-locking nuts. |
t
| Before screwing on oil supply line, fill turbocharger at connection with engine oil. |
t
| After installing turbocharger, run engine for about 1 minute at idling speed to ensure that oil is supplied to turbocharger. |
Engine codes AVQ, BJB, BKC, BRU, BXE and BXF → Chapter |
Changing and adjusting vacuum unit on turbocharger - only vehicles with engine code: BLS from model year 2008 → Chapter |
|
|
|