–
| Tension toothed belt. To do this, turn 2-hole pin wrench -T10020- on eccentric to left (direction of arrow) until indicator -2- is above notch -1- (toothed belt over-tensioned). |
Note Repeat this work step (over-tension toothed belt) 5 times so that the toothed belt settles. |
–
| Now reduce tension on toothed belt until notch -1- and indicator -2- align. |
–
| Tighten securing nut to 20 Nm. |
–
| Turn crankshaft 2 revolutions in direction of engine rotation until engine is again at TDC No. 1 cylinder. It is important that the last 45° of rotation (1/8 turn) is performed without interruption. |
–
| Check toothed belt tension again. Specification: pointer and notch align. |
–
| Check valve timing again. |
–
| Repeat valve timing adjustment. |
–
| Attach engine bracket to cylinder block from above and tighten both upper bolts to 45 Nm. |
–
| Lower engine to installation position. |
–
| Install lower bolt and tighten to 45 Nm. |
–
| Install complete engine assembly mounting. Torque settings → Chapter. |
|
|
|