Workshop Manuals Factory service & repair Volkswagen
01 4-cylinder injection engine (1.4 l direct injection engine, turbocharger)02 4-cyl. direct injection engine (1.8 l and 2.0 l, 4 V, EA 888 gen III, turbocharger, chain drive)03 4-cylinder injection engine (hybrid)04 Fuel supply system - petrol engines, hybrid vehicles05 3-cylinder direct-injection engine (1.0 l engine, 4V, EA 211, turbocharger)06 4-cylinder direct-injection engine (1.2 l engine, 4V, EA 211, turbocharger)07 Engine: 4-Cyl. Common Rail (1.6 l and 2.0 l, 4V, Turbocharger, EA288)08 Fuel supply system - Petrol engines09 Fuel supply system - Diesel engines10 4-cylinder direct-injection engine (1.4 l, natural gas, EA 211, turbocharger)11 Fuel supply system - natural gas engines12 4-cyl. direct injection engine (2.0 l, 4 V, turbocharger, chain drive, generation III) Volkswagen R GmbH13 Fuel supply system – petrol engines, Volkswagen R GmbH14 4-cylinder injection engine (1.6 l engine)15 4-cyl. direct injection engine (1.8 l, 2.0 l, 4 V, turbocharger, chain drive, generation III)16 4-cylinder injection engine (1.6 l engine, 4 valves, MPI)17 4-cyl. diesel engine (2.0 l engine, common rail)18 Propshaft and rear final drive19 6-speed manual gearbox 02Q, 0BB and 0FB20 6-speed manual gearbox 02S21 1-speed gearbox 0CZ22 6-speed dual clutch gearbox 0D923 7-speed dual clutch gearbox 0CW24 6-speed dual clutch gearbox 0DD, hybrid vehicles25 6-speed automatic gearbox 09G26 6-speed manual gearbox 0AJ27 5-speed manual gearbox 0A428 5-speed manual gearbox 0AH29 5-speed manual gearbox 0AF30 6-speed dual clutch gearbox 0D9, Volkswagen R GmbH31 Propshaft and rear final drive Volkswagen R GmbH32 6-speed manual gearbox 0FB Volkswagen R GmbH33 6-speed manual gearbox 02Q34 Wheels and Tyres Guide35 Running gear, axles, steering36 Brake system37 Brake system (hybrid)38 Heating, air conditioning39 Heating and air conditioning: Auxiliary heater40 Electrical System, General Information41 Electrical: Communication42 Electrical system43 Electrical: Electric drive44 General body repairs, interior45 General body repairs, exterior46 Vehicle-specific paint information
Volkswagen Golf Mk7 (2013-2020)03 · 4-cylinder injection engine (hybrid)
03 · Engine

Removing and installing turbocharger

Make
Volkswagen
Model
Golf Mk7
Year
2013–2020
Section
Turbocharger › Removing and installing turbocharger
4-cylinder injection engine (hybrid)Removing and installing turbocharger

Removing and installing turbocharger

General body repairs, exterior

Special tools and workshop equipment requiredEngine bung set VAS 6122
W00-11228
Hose clip pliers VAS 6362
W00-11227
Release tools T10527 and T10527/1
W00-11459

Removing

Note

  • Observe rules for cleanliness → Chapter.
  • Fit all heat shield sleeves in the same place when installing.

When a mechanical fault is found on the turbocharger, e.g. a destroyed compressor impeller, it is not only sufficient to renew the turbocharger. To avoid subsequent damage, the following work must be carried out:

  • Check air filter housing, air filter element and intake hoses for dirt/soiling.
  • Check the whole charge air path and charge air cooler for foreign objects.

If foreign objects are found in the charge air system, the charged air routing must be cleaned and the charge air cooler must be renewed, if necessary.

Remove engine cover panel → Chapter.

Remove noise insulation General body repairs, exteriorRep. gr.66Noise insulation; Removing and installing noise insulation.

Disconnect connector (4) and move wire to one side.

A19-12031

Unscrew nuts (2), and push coolant pump for high-voltage battery V590 to side.

Note

  • Disregard (item 1, 3).

Unscrew centre hex studs (arrows), and remove heat shield for right drive shaft.

N34-11369

Remove heat-shield sleeve.

A17-10801

Disconnect electrical connector (arrow) on oil pressure switch F22.

Remove bolts (arrows) and detach oil supply line (1) and oil return line (2).

A21-10606

Seal off open lines and connections with clean plugs from engine bung set VAS 6122.

Unscrew bolt (2) and remove screw-type clip.

A26-11335

Unscrew nuts (1, 4) and tie up catalytic converter.

Note

  • Disregard (item 3).

Loosen hose clips (1, 2) and remove air pipe.

A24-11135

Disconnect electrical connector (1) from charge pressure sender GX26.

A21-10747

Note

  • Ignore (arrows).

Remove line (2) for activated charcoal filter system. To do this, press release buttons on both sides.

A21-10909

Move clear line for activated charcoal filter system at air pipe.

Release fasteners (arrows) using release tool T10527 and T10527/1.

Remove air pipe (1).

Unscrew bolts (arrows), and detach crankcase breather hose (1).

A15-11776

Disconnect connector (2) at charge pressure positioner V465.

A21-10742

Unscrew bolts (arrows), remove connection (1), and lay it to one side.

Remove bolts (arrows) and pivot coolant lines (1) to right side.

A21-11011

Remove connector (1) for Lambda probe 1 before catalytic converter GX10 from retainer, disconnect it and lay wire to one side.

A24-11477

Note

  • Disregard (item 2).

Unscrew bolts (arrows), remove bracket with heat shield (2) and bracket (1) for engine cover panel, and guide out wire for Lambda probe 1 before catalytic converter GX10 while doing so.

A21-11010

Unscrew nuts (arrows) and remove turbocharger.

A21-10745

Insert screwdriver (2) into groove (arrow) on turbocharger, and lever out seal (1).

N21-10610

Installing

Installation is carried out in the reverse order; note the following:

Note

  • Renew seals and O-rings.
  • Fill turbocharger with engine oil at connection for oil supply line.
  • Secure all hose connections with hose clips meeting production standard Electronic Parts Catalogue.
  • After installing turbocharger, run engine for about 1 minute at idling speed to ensure that oil is supplied to turbocharger.

Electrical connections and routing Current flow diagrams, Electrical fault finding and Fitting locations.

Check coolant level and top up if necessary Anchor.

Specified torques

  • Chapter“Assembly overview - turbocharger”
  • Chapter“Assembly overview - charge-air hose connections”
  • Fig.“Installing catalytic converter - tightening torque and sequence”
  • General body repairs, exteriorRep. gr.66Noise insulation; Assembly overview - noise insulation.

Parts & tools for this job For 2013 Volkswagen Golf

As an Amazon Associate we earn from qualifying purchases.