Workshop Manuals Factory service & repair Volkswagen
01 4-cylinder diesel engine (2.0 l engine, common rail, generation II)02 5-cylinder injection engine (2.5 l engine, 4-valve)03 4-cylinder diesel engine with unit injector04 4-cylinder injection engine (2.0 l turbocharger)05 4-cylinder injection engine (2.0 l engine, chain drive)06 4-cylinder diesel engine (2.0 l engine, common rail)07 5-speed manual gearbox 0AF08 6-speed automatic gearbox 09G09 5-speed manual gearbox 0A410 6-speed dual clutch gearbox 02E11 6-speed manual gearbox 02Q12 6-speed manual gearbox 02S13 7-speed dual clutch gearbox 0AM14 6-speed manual gearbox 0AJ15 Wheels and Tyres Guide - Standard16 Running gear, axles, steering17 Brake systems18 Heating, air conditioning19 Heating and air conditioning: Auxiliary heater20 Electrical System, General Information21 Electrical: Communication22 Electrical system23 General body repairs, exterior24 General body repairs, interior25 4-cylinder Injection engine (1.6 l engine, direct injection)
Volkswagen Jetta Mk5 (2005-2010)03 · 4-cylinder diesel engine with unit injector
03 · Engine

Installing

Make
Volkswagen
Model
Jetta Mk5
Year
2005–2010
Section
Valve gear › Installing
4-cylinder diesel engine with unit injectorInstalling

Installing

Note

  • When installing camshaft, No. 1 cylinder cams (arrows) must point upwards.
A15-0530
  • Do not interchange used bearing shells (mark).
  • When installing the camshaft, ensure proper seating of retaining lugs in bearing caps and cylinder head.
  • Before installing bearing caps, ensure that cylinder head bolt washers are inserted in the cylinder head.

Oil bearing shell running surfaces.

Install bearing caps 2 and 4 using new bolts.

Tighten bearing caps 2 and 4 diagonally and alternately to 8 Nm + 90° (1/4 turn).

Install bearing caps 5, 1 and 3 using new bolts.

Note

  • Seal parting surfaces of bearing caps 1 and 5 with sealant, black AMV 174 004 01Fig..
  • Bearing cap 5 must be flush with outer edge of cylinder head, otherwise leaks can occur at tandem pump.

Tighten bearing caps 5, 1 and 3 likewise to 8 Nm + 90° (1/4).

Install camshaft oil seal → Chapter.

Install rocker arm shafts and tighten new securing bolts, first the inner (2) and then the outer (1), evenly and diagonally to 20 Nm + 90° (1/4 turn).

A15-0531

Fit hub onto camshaft.

Tighten hub securing bolt (1) to 100 Nm.

N15-0271

To do this, use counterhold T10051.

Push camshaft toothed belt pulley onto hub.

Note

  • The toothed segment (arrow) of the camshaft belt pulley must be on top.
N15-0275

Align camshaft toothed belt pulley at centre of elongated holes.

Hand tighten securing bolts (1) to camshaft toothed belt pulley so that there is no play.

Lock hub using locking pin 3359.

Install and tension toothed belt → Chapter.

Install tandem pump → Chapter.

Note

  • After installing camshafts wait for approx. 30 minutes before starting engine. Hydraulic compensation elements must settle (otherwise valves will strike pistons).

Parts & tools for this job For 2005 Volkswagen Jetta

As an Amazon Associate we earn from qualifying purchases.