Removing and installing heat exchanger (LHD)
- Make
- Volkswagen
- Model
- Jetta Mk6
- Year
- 2011–2018
- Section
- Heater unit › Removing and installing heat exchanger (LHD)
Removing and installing heat exchanger (LHD)
Special tools and workshop equipment requiredDrip tray for workshop hoist VAS 6208



Note
- Depending on the engine and the type of vehicle, it may be necessary to detach or remove the following components: engine cover panel, intake hose, air filter housing, pressure pipe to throttle valve module, and, depending on engine, intake manifold.
- Depending on the engine, a heat shield may be installed in front of the expansion valve.

Unscrew nut (1).
Remove clamping washer (2).
Remove clip (3).
Detach heat shield (4) from plenum chamber bulkhead.

Clamp off coolant hoses to heat exchanger (2) with hose clamps up to 40 mm 3093.
Place drip tray VAS 6208 beneath engine.
Warning The cooling system remains pressurised while the engine is warm!
Danger of scalding due to steam and hot coolant.
Reduce excess pressure by covering the cap of the coolant expansion tank with a cloth and opening it carefully.
Release securing clips (1) in direction of (arrow) and remove coolant hoses (2).
Push suitable hose (A) onto upper connection leading to heat exchanger.

Hold suitable container (B) under lower connection leading to heat exchanger (C).
Using a compressed air gun via hose (A), carefully blow coolant out of heat exchanger into container (B).
Unscrew bolt (1) between coolant lines (2).

Remove footwell vent on driver side → Chapter.
Remove left footwell trim on driver side General body repairs, interiorRep. gr.68Centre console; Removing and installing centre console.

Unscrew bolts (arrows).
Note
- Adjust left temperature flap control motor V158 via the control and display unit so that the upper bolts of the cover are accessible.
- Depending on vehicle equipment, some covers may be secured with only 3 bolts.
Remove heat exchanger cover (1) from heater and air conditioning unit.
Place waterproof foil and absorbent paper over floor covering in area under heat exchanger.
Release and remove clips (1).

Pull coolant lines (2) off heat exchanger. Collect escaping coolant in a suitable container.
Seal off open lines and connections with clean plugs from engine bung set VAS 6122.
Remove bolts (1).

Note
- Adjust left temperature flap control motor V158(3) via the control and display unit so that bolt (2) is accessible.
Remove bolt (2).
Remove cover (4).
Take heat exchanger out of heater unit.
Installation is carried out in the reverse order. When installing, note the following:
Note
- Renew seals.
- An improperly bonded seal can roll up when heat exchanger is pushed into heater unit.
- If seal is damaged or improperly attached, cold air can flow past heat exchanger.
Warning Risk of malfunction on heat exchanger due to defective seals and leaks.
- Never squeeze seals.
- Never cant coolant pipes.
- Slide on coolant pipes completely.
Check seals attached to heat exchanger (1 and 2). Only install heat exchanger with intact seals.

Check installation slot of heat exchanger (1) for soiling when the heat exchanger is removed.

Remove any dirt or coolant residue from heater and air conditioning unit, e.g. following removal of a leaking heat exchanger.
Moisten seals with coolant before installing.
Fill with coolant Rep. gr.19Cooling system, coolant; Draining and filling with coolant.
- Chapter“Assembly overview - heater and air conditioning unit”
- Chapter“Assembly overview – heater unit”
| Component | Specified torque |
|---|---|
| Bolt for coolant lines | 2 Nm |
Parts & tools for this job For 2011 Volkswagen Jetta
- TOOLA/C manifold gauge setSearch: AC manifold gauge set
- TOOLUV leak detection kitSearch: AC UV leak detection kit
- PARTCabin filterSearch: Volkswagen Jetta 2011 cabin filter
As an Amazon Associate we earn from qualifying purchases.