Jetta L5-2.5L (CBTA) (2008)
-
Insert new seal - 5 - into oil pump - 6 -.
-
Bolt intake line - 1 - with bolts - 2 - and - 3 - as well as bracket - 4 -.
-
Install glide track - 2 - , relieve tension on chain tensioner - 1 - and pull out Locking Pin T10115.
-
Adjust valve timing.
The rest of installation follows the reverse of the removal procedures. When doing this note the following:
^
After installing oil pan, allow sealant to dry for approx. 30 minutes. Only after then may the engine oil be replenished.
^
Remove locking pin T40069 from cylinder block at rear and install screw plug.
^
Fill with coolant.
Tightening specifications:
