Installing
- Make
- Volkswagen
- Model
- LT Mk2
- Year
- 1996–2006
- Section
- Charge air system with turbocharger › Installing
Installing
Install in reverse order. When doing this, note the following:
Coat thread and head contact surface of securing nuts between exhaust manifold and turbocharger with grease G 000 500 and tighten to 60 Nm.
Position oil return line (with new seal) and tighten to 10 Nm.
Fill turbocharger with engine oil at connection for oil supply pipe.
Position oil supply pipe with new seals and tighten banjo bolt to 20 Nm.
Install front exhaust pipe (with new gasket) and tighten to 25 Nm.
Note
- When installing, tighten all bolts lightly (parts must still just be able to move against one another). Then tighten so parts are free of stress.
After installing turbocharger, operate engine about 1 minute at idle and do not rev up immediately so that oil supply to turbocharger is assured.
Parts & tools for this job For 1996 Volkswagen LT
- PARTGlow plugsSearch: Volkswagen LT 1996 glow plugs
- TOOLGlow plug socketSearch: glow plug socket
- TOOLDiesel compression testerSearch: diesel compression tester
As an Amazon Associate we earn from qualifying purchases.