Test procedure
- Make
- Volkswagen
- Model
- LT Mk2
- Year
- 1996–2006
- Section
- Checking additional signals › Test procedure
Test procedure
Connect vehicle diagnosis, testing and information system VAS 5051Chapter. When doing this, the engine must be running at idling speed.
Press key “03 - Final control diagnosis” on display.
Indicated on display:
Press the → button.
Indicated on display:
Press the → button.
Indicated on display:
Air conditioner compressor switch-off is checked.
The air conditioner compressor must stop within 5 seconds (visual check) then start approx. every 5 seconds and then stop again.
If the conditioner compressor is not switched off:
Proceed with final control diagnosis until completed.
Press the ← button.
Press key “06 - End output” on display.
Switch off ignition.
Connect test box V.A.G 1598/18 to control unit wiring harness → Chapter.
Check wiring between test box sockets 28 and air conditioner for open circuit using current flow diagram. Wire resistance: max. 1.5 Ω Current flow diagrams, Electrical fault finding and Fitting locations
Connect test box V.A.G 1598/31 to control unit wiring harness → Chapter.
Check wiring between test box sockets 29 and air conditioner for open circuit using current flow diagram. Wire resistance: max. 1.5 Ω Current flow diagrams, Electrical fault finding and Fitting locations
Parts & tools for this job For 1996 Volkswagen LT
- PARTGlow plugsSearch: Volkswagen LT 1996 glow plugs
- TOOLGlow plug socketSearch: glow plug socket
- TOOLDiesel compression testerSearch: diesel compression tester
As an Amazon Associate we earn from qualifying purchases.