Workshop Manuals Factory service & repair Volkswagen
01 5-cylinder diesel engine02 4-cylinder diesel engine (common rail)03 4-cylinder diesel engine (distributor-type injection pump)04 Running gear: Guide for using trailers05 Wheels and Tyres Guide - General Information06 Running gear: Guide for increasing and decreasing load ratings07 Running gear, axles, steering08 Wheels and Tyres Guide09 Brake systems10 Electrical system11 General body repairs, exterior12 General body repairs, interior13 Heating, air conditioning
Volkswagen LT Mk2 (1996-2006)01 · 5-cylinder diesel engine
01 · Engine

Installing

Make
Volkswagen
Model
LT Mk2
Year
1996–2006
Section
Removing and installing cylinder head › Installing
5-cylinder diesel engineInstalling

Installing

Warning When doing any repair work, especially in the engine compartment, pay attention to the following due to the cramped conditions:

  • Route all the various lines (e.g. for fuel, hydraulics, activated charcoal filter system, coolant, refrigerant, brake fluid and vacuum) and electrical wiring in their original positions.
  • Ensure that there is sufficient clearance to all moving or hot components.

Note

  • Always renew cylinder head bolts.
  • In cases of repair carefully remove gasket remains from cylinder head and cylinder block. Ensure that no long scores or scratches are created. When using abrasive paper do not use a grade less than 100.
  • Carefully remove remains of emery and abrasives.
  • Remove new cylinder head gasket from packaging, just before installation.
  • Handle gasket very carefully. Damaging the silicone layer or the indented area will lead to leaks.

Turn crankshaft to TDC marking before fitting cylinder head.

Turn crankshaft back, against engine direction of rotation, until no piston is at TDC.

Position cylinder head gasket.

To centre, screw guide pins 3070 into outer threaded holes on intake side.

V15-0488

Fit cylinder head, screw in 10 remaining cylinder head bolts and tighten by hand.

Remove guide pins 3070 from bolt holes with removal tool and install cylinder head bolts.

Tighten cylinder head in four stages in sequence shown as follows:

N15-0058
Tighten initially with torque wrench:Stage I = 40 NmStage II = 60 NmTurn further with rigid spanner:Stage III = 1/4 turn (90°)Stage IV = 1/4 turn (90°)

Note

  • Loosening cylinder head: opposite to given sequence.
  • Cylinder head bolts do not have to be torqued down again later after repair work.

After tightening cylinder head, turn camshaft so that cams for No. 1 cylinder equally point upwards. Turn crankshaft, in engine direction of rotation, to TDC marking before fitting toothed belt.

Parts & tools for this job For 1996 Volkswagen LT

As an Amazon Associate we earn from qualifying purchases.