Procedure
- Make
- Volkswagen
- Model
- LT Mk2
- Year
- 1996–2006
- Section
- Removing and installing engine › Procedure
Procedure
Installation is carried out in the reverse order. When installing, note the following:
Warning When doing any repair work, especially in the engine compartment, pay attention to the following due to the cramped conditions:
- Route all the various lines (e.g. for fuel, hydraulics, activated charcoal filter system, coolant, refrigerant, brake fluid and vacuum) and electrical wiring in their original positions.
- Ensure that there is sufficient clearance to all moving or hot components.
Check clutch release bearing for wear and renew if necessary.
Lightly lubricate clutch release bearing, release bearing guide sleeve and splines on input shaft with grease G 000 100.
Ensure dowel sleeves are fitted into cylinder block, to centralise engine and gearbox, (fit as necessary): 5-speed manual gearbox 000.1 and 000.2Rep. Gr.34Repairing clutch housing.
When installing engine and gearbox, ensure that there is sufficient clearance to steering box.
Tighten left and right engine mounting securing bolts by hand to just before stop.
Secure engine and gearbox rear cross member and bolt gearbox to gearbox mounting: 5-speed manual gearbox 000.1 and 000.2Rep. Gr.34Removing and installing gearbox.
Align engine and gearbox mounting free of stress by rocking assembly.
Tighten left and right engine mounting securing bolts.
Install clutch slave cylinder with line on gearbox: 5-speed manual gearbox 000.1 and 000.2Rep. Gr.34Removing and installing gearbox.
Bolt propshaft to gearbox flange: Rear axleRep. Gr.39Removing and installing propshaft.
Bolt earth cable to gearbox.
Install front exhaust pipe → Chapter, removing and installing parts of exhaust system.
Install gearstick on gearbox: 5-speed manual gearbox 000.1 and 000.2Rep. Gr.34Repairing selector mechanism; Removing and installing gearstick.
Install maintenance opening cover: General body repairs, exteriorRep. Gr.50Body - front; Removing maintenance opening cover.
Install radiator with charge air cooler → Chapter.
Install expansion tank with coolant hoses.
Install coolant hoses → Chapter, Removing and installing parts of cooling system.
Install power assisted steering vane pump: Running gear, axles, steeringRep. Gr.48Assembly overview - vane pump, reservoir, hydraulic lines.
Install poly V-belt → Chapter.
Installing lock carrier with attachments:General body repairs exteriorRep. Gr.50Body - front; Removing and installing lock carrier with attachments.
Install left and right steps: General body repairs, exteriorRep. Gr.63Assembly overview - front bumper.
Install bonnet General body repairs, exteriorRep. Gr.55Bonnet.
Electrical connections and routing Current flow diagrams, Electrical fault finding and Fitting locations.
Replenish coolant → Chapter.
Check headlight adjustment and correct if necessary MaintenanceBooklet.
Carry out road test and read all fault memories: Chapter.
Parts & tools for this job For 1996 Volkswagen LT
- PARTEngine gasket setSearch: Volkswagen LT 1996 engine gasket set
- TOOLTorque wrenchSearch: 3/8 inch torque wrench
- TOOLFeeler gauge setSearch: feeler gauge set
As an Amazon Associate we earn from qualifying purchases.