Workshop Manuals Factory service & repair Volkswagen
01 5-cylinder diesel engine02 4-cylinder diesel engine (common rail)03 4-cylinder diesel engine (distributor-type injection pump)04 Running gear: Guide for using trailers05 Wheels and Tyres Guide - General Information06 Running gear: Guide for increasing and decreasing load ratings07 Running gear, axles, steering08 Wheels and Tyres Guide09 Brake systems10 Electrical system11 General body repairs, exterior12 General body repairs, interior13 Heating, air conditioning
Volkswagen LT Mk2 (1996-2006)01 · 5-cylinder diesel engine
01 · Engine

Removing

Make
Volkswagen
Model
LT Mk2
Year
1996–2006
Section
Repairing diesel direct injection system › Removing
5-cylinder diesel engineRemoving

Removing

Remove injection pump toothed belt → Chapter.

Loosen injection pump pulley securing nut approx. one turn with counterhold tool 3036.

N23-0170

Remove idler roller.

Remove injector lines using ring spanner 3035.

Note

  • Always remove injector line set complete. Do not alter shape.

Cover openings with a clean cloth.

Set injection pump pulley under tension with puller 3032.

N23-0169

Note

  • Screw two socket head bolts 3032/13(1) into threaded holes of injection pump pulley instead of using the puller legs.

Release injection pump pulley from taper of injection pump by striking spindle of puller (arrow) gently.

Remove injection pump pulley.

Vehicles with a 10-pin injection pump connector

Disconnect injection pump 10-pin connector and knock connector out of retainer → Chapter.

Vehicles with a 7-pin injection pump connector

Disconnect fuel shut-off valve/commencement of injection valve connector.

Disconnect metering adjuster connector and unclip connector from retainer.

Continuation for all vehicles

Unscrew securing bolts (1) and conical nut (2) from bracket.

N23-0122

Remove injection pump.

Parts & tools for this job For 1996 Volkswagen LT

As an Amazon Associate we earn from qualifying purchases.