New Beetle L4-2.0L (AVH) (2005)
-
Remove bolts - arrows-.
-
Loosen bolt - arrow A -.
Note:
^
The assembly mounting may only be removed if the engine is supported with engine support bridge 10-222A!
^
The engine mounting may only be loosened if the assembly mounting has been removed.
-
Remove vibration damper/belt pulley.
-
Remove bolts - arrows - and remove engine bracket from cylinder head.
Note:
The engine must be lifted slightly with the support bridge when loosening the front bolt of the engine bracket.
-
Remove middle and lower toothed belt guard.
-
Mark direction of rotation of toothed belt.
-
Loosen tensioning roller and take toothed belt off.
-
Turn crankshaft back slightly.
Installing
Condition
^
Pistons must not be positioned at TDC. Turn crankshaft back slightly if necessary.
Work sequence
-
Place toothed belt on crankshaft pulley and coolant pump pulley (observe marked direction of rotation).
Note:
^
With engine removed, begin by installing the lower toothed belt guard and the damper/belt pulley.
Adjusting valve timing
Note:
^
When turning the camshaft the crankshaft must not be at TDC. Danger of damage to valves/piston crown.
-
Align mark on camshaft with mark on toothed belt cover - arrows -.
Engine installed
-
Turn crankshaft to TDC No.1 cylinder (vehicles with a manual transmission).