Volkswagen Workshop Service and Repair Manuals
HOME
FEATURES
MENU
INDEX
ABOUT US
Removing and installing sealing flange and flywheel >
< Removing and installing toothed belt
Passat (B3)
Power unit
4-Cyl. fuel injection engine (4-valve), Mechanics
Enginecrankshaft group, pistons / Dismantling and assembling engine
Checking semi-automatic toothed belt tensioning roller
4-Cyl. fuel injection engine (4-valve), Mechanics
Dismantling and assembling engine
Checking semi-automatic toothed belt tensioning roller
Test conditions
●
Toothed belt installed and tensioned
Test sequence
‒
Turn crankshaft two turns in engine direction of rotation, until it is on TDC cylinder 1.
‒
→ Note the position of the tensioning roller indicator -arrow-. Press the toothed belt with firm thumb pressure. The indicator must move.
‒
Release tension on toothed belt.
‒
Turn crankshaft two turns in engine direction of rotation.
‒
Then check the position of the indicator. It must have return to its original position.
If tensioning roller does not return to initial position:
‒
Replace tensioning roller.
Power unit
4-Cyl. fuel injection engine (4-valve), Mechanics
Enginecrankshaft group, pistons / Dismantling and assembling engine
Checking semi-automatic toothed belt tensioning roller
Removing and installing sealing flange and flywheel >
< Removing and installing toothed belt