Procedure
- Make
- Volkswagen
- Model
- Passat B5
- Year
- 1996–2005
- Section
- Dismantling and assembling engine › Procedure
4-cylinder diesel engine with distributor-type injection pumpProcedure
Procedure
Bring lock carrier into service position General body repairs, exteriorRep. Gr.50Lock carrier.
Mark direction of rotation of poly V-belt.
Using a spanner on the securing bolt, swing tensioning roller (in direction of arrow).

Remove or fit poly V-belt.
Note
- When installing poly V-belt, ensure that belt seats correctly in pulleys.
Parts & tools for this job For 1996 Volkswagen Passat
- PARTEngine gasket setSearch: Volkswagen Passat 1996 engine gasket set
- TOOLTorque wrenchSearch: 3/8 inch torque wrench
- TOOLFeeler gauge setSearch: feeler gauge set
As an Amazon Associate we earn from qualifying purchases.