Tensioning toothed belt
- Make
- Volkswagen
- Model
- Passat B5
- Year
- 1996–2005
- Section
- Removing and installing cylinder head › Tensioning toothed belt
Tensioning toothed belt
The engine must be no more than warm to touch.Engine positioned at TDC No. 1 cylinder.Note
- If the toothed belt tensioning element is fully extended, it must be pushed back with tensioning roller when installed. This process can take up to 5 minutes. Too much force when compressing the tensioning roller can damage it
Turn eccentric anticlockwise using pin wrench 3387 (lug (A) of eccentric must not be bent), until the locking plate T10008 is not under tension and can be pulled out.

Turn eccentric clockwise in (direction of arrow) until a drill (2) of dimension (a) can be pulled out between tensioning lever and tensioner housing.

Hold tensioning roller in this position and tighten tensioning roller securing nut (1).
Specified torque: 27 NmTurn crankshaft two full turns and check whether camshaft and crankshaft marks align with their reference points.

Check, using a drill (2) the dimension (a) between tensioning lever and housing.

Repeat procedure → Chapter.
Install middle and upper toothed belt guards and tighten securing bolts to 10 Nm.
Install poly V-belt tensioner.
Specified torque: 25 NmInstall poly V-belt → Chapter.
Parts & tools for this job For 1996 Volkswagen Passat
- PARTTiming belt kitSearch: Volkswagen Passat 1996 timing belt kit
- TOOLEngine timing tool setSearch: Volkswagen engine timing tool set
- TOOLTorque wrenchSearch: 3/8 inch torque wrench
As an Amazon Associate we earn from qualifying purchases.