Notes on installing
- Make
- Volkswagen
- Model
- Passat B5
- Year
- 1996–2005
- Section
- Removing and installing engine › Notes on installing
Notes on installing
Install in reverse order. In the process, note the following:
Warning When doing any repair work, especially in the engine compartment, pay attention to the following due to the cramped conditions:
- Route all the various lines (e.g. for fuel, hydraulics, activated charcoal filter system, coolant, refrigerant, brake fluid and vacuum) and electrical wiring in their original positions.
- Ensure that there is sufficient clearance to all moving or hot components.
Check clutch release bearing for wear and renew if necessary.
Lightly grease clutch release bearing and splines on input shaft with G 000 100 (do not grease release bearing guide sleeve).
A needle bearing must be fitted in the crankshaft on vehicles with manual gearbox; insert needle bearing if not yet fitted → Chapter.
Ensure that the intermediate plate is correctly located on engine.
Use original bolts to secure torque converter to drive plate Parts catalogue.
Before installing engine, rotate torque converter and engine drive plate so that one hole is in the starter motor aperture.
Check whether dowel sleeves for centring engine and gearbox are in cylinder block and install if necessary.
Renew engine mounting self-locking nuts.
Rock engine to align engine mountings stress-free.
Install air conditioner compressor: Heating, air conditioning systemRep. gr.87Air conditioner compressor bracket.
Install power-assisted steering vane pump: Running gear, axles, steering; Front and four-wheel driveRep. gr.48Vane pump, reservoir, hydraulic lines for vehicles with 4 or 5-cylinder engines
Install poly V-belt → Chapter.
Install lock carrier with attachments: General body repairs, exteriorRep. gr.50Lock carrier; Removing and installing lock carrier with attachments, 10.00 ▶.
Bolt front exhaust pipe to catalytic converter or exhaust manifold → Chapter.
Observe additional information and installation work → Chapter.
Electrical connections and routing Current flow diagrams, Electrical fault finding and Fitting locations.
Install starter: Electrical systemRep. gr.27Starter -B-; Removing and installing starter on vehicles with 4, 5 and 6-cylinder engines.
Install air filter with intake hose and air mass meter G70.
Replenish coolant → Chapter.
Check headlight adjustment and correct if necessary MaintenanceBooklet.
Connect ATF lines (arrows): 5-speed automatic gearbox 01VRep. gr.37Dismantling and assembling gearbox; Removing and installing ATF lines on vehicles with a 4-cylinder engine.

Check and if necessary top-up ATF: 5-speed automatic gearbox 01VRep. gr.37Checking ATF level and topping-up.
Carry out road test and read fault memories → Chapter.
Parts & tools for this job For 1996 Volkswagen Passat
- PARTEngine gasket setSearch: Volkswagen Passat 1996 engine gasket set
- TOOLTorque wrenchSearch: 3/8 inch torque wrench
- TOOLFeeler gauge setSearch: feeler gauge set
As an Amazon Associate we earn from qualifying purchases.