Removing and installing
- Make
- Volkswagen
- Model
- Passat B5
- Year
- 1996–2005
- Section
- Cylinder head › Removing and installing
5-cylinder injection engine (4-valve), mechanicsRemoving and installing
Removing and installing

- Bracket
For coolant pipe and wiring harness
Coolant hose schematic diagram → Chapter. - 8 Nm
- Hall sender 2 G163
For exhaust camshaft.
Before removing, mark connector belonging to component.
Checking: Fault memoryRep. gr.01Reading and erasing fault memory - Chain tensioner, 40 Nm
For camshaft timing chain Item
Only rotate engine when chain tensioner is installed. - Seal
Renew if damaged or leaking. - Bracket
For continued coolant circulation pump - Continued coolant circulation pump V51
Coolant hose schematic diagram → Chapter.
Check → Chapter. - Seal
For valve (1) for inlet camshaft control N205, Item and valve (1) for exhaust camshaft control N318, Item.
Renew if damaged or leaking.
Installing → Fig.. - 23 Nm
- Thermostat housing
Dismantling and assembling → Chapter.
Coolant hose schematic diagram → Chapter. - Retaining clamp
- Seal
Renew. - Cover
Can be removed and installed with cylinder head fitted.
Sealant for sealing surfaces ETKA (Electronic parts catalogue).
If only cover has been removed, prepare cylinder head gasket for assembly → Fig..
With O-ring for sealing oil channel Item - Hall sender G40
For inlet camshaft.
Before removing, mark connector belonging to component.
Checking: Fault memoryRep. gr.01Reading and erasing fault memory - O-ring
For sealing oil channel.
Renew.
Lubricate before installing.


Do not lubricate seals.
Install oil seal with fitting sleeve 3378 in cover (1) and pull in flush using fitting sleeve 3253/6 from assembly tool 3253.

Parts & tools for this job For 1996 Volkswagen Passat
- PARTEngine gasket setSearch: Volkswagen Passat 1996 engine gasket set
- TOOLTorque wrenchSearch: 3/8 inch torque wrench
- TOOLFeeler gauge setSearch: feeler gauge set
As an Amazon Associate we earn from qualifying purchases.