Workshop Manuals Factory service & repair Volkswagen
01 5-cylinder injection engine, mechanics02 4-cylinder injection engine03 5-cylinder injection engine (4-valve), mechanics04 4-cylinder diesel engine with distributor-type injection pump05 4-cylinder diesel engine (2.0 l engine)06 4-cylinder injection engine (5-valve)07 4-cylinder diesel engine with unit injector08 4-cylinder injection engine (5-valve without intermediate shaft)09 Motronic injection and ignition system (5-cyl. 4-valve)10 6-cylinder injection engine11 4-cylinder injection engine (2-valve without intermediate shaft), mechanics12 8-cylinder injection engine13 5-speed automatic gearbox four-wheel drive 01V14 4-speed automatic gearbox 01N15 5 and 6-speed manual gearbox 01E, 0A116 Servicing automatic gearbox 01V, front-wheel drive and all-wheel drive17 6-speed manual gearbox 01E, four-wheel drive18 6-speed manual gearbox 0A219 5-speed manual gearbox 012/01W/0A920 5-speed manual gearbox 01A, all-wheel drive21 5-speed automatic gearbox 01V22 Running gear, Axles, Steering, Front and four wheel drive23 Protect brake systems24 Running gear, axles, steering, Protect25 Brake systems26 Heating, air conditioning27 Electrical system self-diagnosis28 Electrical system29 Protect Electrical system.30 Electrical: Communication31 General body repairs, exterior32 General body repairs, interior33 Body Protect34 6-cylinder diesel engine
Volkswagen Passat B5 (1996-2005)34 · 6-cylinder diesel engine
34 · Engine

Procedure

Make
Volkswagen
Model
Passat B5
Year
1996–2005
Section
Removing and installing cylinder head › Procedure
6-cylinder diesel engineProcedure

Procedure

Turn crankshaft and camshaft to TDC marking before fitting cylinder head. Camshaft holder 3458 must be fitted in camshaft and locking pin 3242 must be screwed in.

A13-0120

Fit new cylinder head gasket. Lettering (Part No.) must be readable.

Note

  • If the cylinder head gasket or cylinder head is replaced, the new and old gaskets must have the same number of holes.
  • If parts of the crankshaft assembly have been renewed, the new cylinder head gasket must be selected by measuring the piston projection at TDC Chapter.

Renew coolant pipe O-rings before installing cylinder head.

Fit the cylinder head.

Insert new cylinder head bolts and tighten hand-tight.

Tighten cylinder head in four stages in sequence shown as follows:

A15-0189
Tighten initially with torque wrench:Stage I = 35 NmStage II = 60 NmTurn further with rigid spanner:Stage III = 1/4 turn (90°)Stage IV = 1/4 turn (90°)

When installing right cylinder head, replace O-ring below on dip stick guide tube. To do this, remove poly-V-belt, loosen alternator and swing aside.

Further assembly is basically the reverse of the dismantling procedure.

Fit toothed belt onto camshaft pulleys → Chapter.

Fill coolant system with coolant. Chapter

Bleed fuel system → Chapter.

Warning Attempts to start engine before fuel system is bled could lead to injection pump damage.

After reconnecting battery, enter radio anti-theft code: Radio operating instructions.

Note

  • Faults will have been stored because the connector to injection pump has been separated. Therefore read and erase fault memory.

Reading and erasing fault memory → Chapter.

Parts & tools for this job For 1996 Volkswagen Passat

As an Amazon Associate we earn from qualifying purchases.