Procedure
- Make
- Volkswagen
- Model
- Passat B5
- Year
- 1996–2005
- Section
- Removing and installing cylinder head › Procedure
Procedure
Turn crankshaft and camshaft to TDC marking before fitting cylinder head. Camshaft holder 3458 must be fitted in camshaft and locking pin 3242 must be screwed in.

Fit new cylinder head gasket. Lettering (Part No.) must be readable.
Note
- If the cylinder head gasket or cylinder head is replaced, the new and old gaskets must have the same number of holes.
- If parts of the crankshaft assembly have been renewed, the new cylinder head gasket must be selected by measuring the piston projection at TDC Chapter.
Renew coolant pipe O-rings before installing cylinder head.
Fit the cylinder head.
Insert new cylinder head bolts and tighten hand-tight.
Tighten cylinder head in four stages in sequence shown as follows:

When installing right cylinder head, replace O-ring below on dip stick guide tube. To do this, remove poly-V-belt, loosen alternator and swing aside.
Further assembly is basically the reverse of the dismantling procedure.
Fit toothed belt onto camshaft pulleys → Chapter.
Fill coolant system with coolant. Chapter
Bleed fuel system → Chapter.
Warning Attempts to start engine before fuel system is bled could lead to injection pump damage.
After reconnecting battery, enter radio anti-theft code: Radio operating instructions.
Note
- Faults will have been stored because the connector to injection pump has been separated. Therefore read and erase fault memory.
Reading and erasing fault memory → Chapter.
Parts & tools for this job For 1996 Volkswagen Passat
- PARTEngine gasket setSearch: Volkswagen Passat 1996 engine gasket set
- TOOLTorque wrenchSearch: 3/8 inch torque wrench
- TOOLFeeler gauge setSearch: feeler gauge set
As an Amazon Associate we earn from qualifying purchases.