Workshop Manuals Factory service & repair Volkswagen
01 5-cylinder injection engine, mechanics02 4-cylinder injection engine03 5-cylinder injection engine (4-valve), mechanics04 4-cylinder diesel engine with distributor-type injection pump05 4-cylinder diesel engine (2.0 l engine)06 4-cylinder injection engine (5-valve)07 4-cylinder diesel engine with unit injector08 4-cylinder injection engine (5-valve without intermediate shaft)09 Motronic injection and ignition system (5-cyl. 4-valve)10 6-cylinder injection engine11 4-cylinder injection engine (2-valve without intermediate shaft), mechanics12 8-cylinder injection engine13 5-speed automatic gearbox four-wheel drive 01V14 4-speed automatic gearbox 01N15 5 and 6-speed manual gearbox 01E, 0A116 Servicing automatic gearbox 01V, front-wheel drive and all-wheel drive17 6-speed manual gearbox 01E, four-wheel drive18 6-speed manual gearbox 0A219 5-speed manual gearbox 012/01W/0A920 5-speed manual gearbox 01A, all-wheel drive21 5-speed automatic gearbox 01V22 Running gear, Axles, Steering, Front and four wheel drive23 Protect brake systems24 Running gear, axles, steering, Protect25 Brake systems26 Heating, air conditioning27 Electrical system self-diagnosis28 Electrical system29 Protect Electrical system.30 Electrical: Communication31 General body repairs, exterior32 General body repairs, interior33 Body Protect34 6-cylinder diesel engine
Volkswagen Passat B5 (1996-2005)34 · 6-cylinder diesel engine
34 · Engine

Installing

Make
Volkswagen
Model
Passat B5
Year
1996–2005
Section
Repairing diesel direct injection system › Installing
6-cylinder diesel engineInstalling

Installing

Position injection pump horizontally on a flat surface (for example using 2 equal height wooden blocks).

Screw injector lines onto injection pump so that distance (C) is 70 mm for all lines.

Torque setting: 30 Nm.

A23-0117

Note

  • Do not rework as the torque presses on the taper (danger of leaks).
  • Ensure that the injection lines are not interchanged or twisted.

When measuring, slide the union nut back slightly to ensure the measurement is undertaken on top of the taper of the line.

Distance (C) is calculated as follows: distance (A) minus distance (B) (support) provides distance (C) = 70 mm.

A23-0117

Note

  • Check that both fitting sleeves are fitted to centralize the injection pump in the cylinder block or fit if necessary.

Fit injection pump on cylinder block and secure.

Bolt torque setting to cylinder block: 20 Nm

Bolt torque setting to toothed belt guard: 10 Nm

A23-0050

Screw injector lines onto injectors and tighten to 30 Nm.

Note

  • Do not rework as the torque presses on the taper (danger of leaks).
  • Ensure that the injection lines are not interchanged or twisted.

Lock injection pump pulley in position with locking pin 3359.

A23-0052

Loosen securing bolts (1) for camshaft toothed belt pulley.

A23-0053

Align camshaft toothed belt pulley at centre of elongated holes.

Fit toothed belt (note direction of rotation).

Tension toothed belt. Turn hexagon key anti-clockwise until the marks (arrow) align over one another.

N23-0300

Tighten securing nut with ring insert T10023.

Torque setting: 36 Nm.

Tighten camshaft pulley securing bolts to 20 Nm.

Remove locking pin 3359 from injection pump pulley.

Remove locking pin 3242.

Turn crankshaft two rotations in engine direction of rotation until crankshaft is set to OT (TDC) again.

Check the toothed belt tensioner marks again.

Install vibration damper and tighten the securing bolts (1) to 20 Nm.

A23-0047

Install TDC mark sealing plug on cylinder block.

Install front intake manifold → Chapter.

Reconnect connector to injection pump.

Reconnect fuel lines.

Fill injection pump, through return line union, with clean diesel → Chapter.

Parts & tools for this job For 1996 Volkswagen Passat

As an Amazon Associate we earn from qualifying purchases.