Removing
- Make
- Volkswagen
- Model
- Passat B5
- Year
- 1996–2005
- Section
- Cylinder head › Removing
Removing
Warning When doing any repair work, especially in the engine compartment, pay attention to the following due to the cramped conditions:
- Route all the various lines (e.g. for fuel, hydraulics, activated charcoal filter system, coolant and refrigerant, brake fluid and vacuum) and electrical wiring in their original positions.
- Ensure that there is sufficient clearance to all moving or hot components.
All cable ties which are opened or cut through when engine is removed must be replaced in the same position when engine is installed.
First check whether a coded radio is fitted. If so, obtain anti-theft coding.
Switch off ignition and all electrical consumers.
Disconnect battery earth strap Electrical systemRep. gr.27Battery; Removing and installing battery.
Remove intake manifold cover.
Remove noise insulation General body repairs, exteriorRep. gr.50Assembly overview - noise insulation.
Drain coolant → Chapter.
Remove retaining plate variable intake manifold changeover valve and secondary air inlet valve (if part of original equipment) as follows:

Remove intake elbow with connecting hose.
Remove coolant expansion tank.
Remove vacuum unit for cruise control system (only vehicles with cruise control system).
Disconnect throttle cable at cable disc of throttle valve control module and at cable support bracket (arrows) (do not remove locating clip on cable support bracket).

Loosen or separate the following components:
- Connecting pipe between secondary air pump motor and combination valves at the combination valves (vehicles with secondary air system).
- Wire/hose from activated charcoal filter system solenoid valve 1.
- Line for crankcase breather on cylinder head cover.
- Connector on throttle valve control module.
- Connector from ignition coil output stages.
- Connector(s) from valves for camshaft adjustment and Hall senders.
- Connector from coolant temperature sender.
- The vacuum hose from fuel pressure regulator.
Then remove the fuel rail as follows:
Pull connector off injectors.Unbolt fuel rail from intake manifold and pull out together with injectors.Place fuel rail to side (the fuel hoses remain connected).Remove bracket with ignition coils.
Remove intake manifold with throttle valve control module, separate coolant and vacuum lines.
Remove left combination valve ItemItem (only vehicles with secondary air system).
Remove rear coolant pipe Item.
Unbolt front exhaust pipe from exhaust manifolds .
Perform work sequences to remove toothed belt → Chapter:
Remove vibration damper/belt pulley.Remove toothed belt guard belt pulley.Remove viscous fan coupling bracket.Remove air filter.
Pull out oil dipstick and remove guide tube for oil dipstick.
Unbolt power-assisted steering box pressure line from cylinder head cover and rear coolant pipe.
Remove rear toothed belt guard from cylinder head.

Unbolt coolant pipe on front of cylinder head.
Remove cylinder head cover.
Loosen cylinder head bolts in sequence given and then remove completely.

Note
- Use key T10070 for Polydrive cylinder head bolts.
Carefully remove cylinder head.
Parts & tools for this job For 1996 Volkswagen Passat
- PARTEngine gasket setSearch: Volkswagen Passat 1996 engine gasket set
- TOOLTorque wrenchSearch: 3/8 inch torque wrench
- TOOLFeeler gauge setSearch: feeler gauge set
As an Amazon Associate we earn from qualifying purchases.