Installing upper sump
- Make
- Volkswagen
- Model
- Passat B5
- Year
- 1996–2005
- Section
- Parts of lubrication system › Installing upper sump
8-cylinder injection engineInstalling upper sump
Installing upper sump
Fit the upper sump with a new seal and install it.
Tighten bolts in sequence shown and observe the different lengths of the bolts:

Specified torque: 20 Nm.10M8×160
Specified torque: 20 Nm.11 und 12M8×140
Specified torque: 20 Nm.13...15M8×26
Specified torque: 20 Nm.16...26M6×28
Specified torque: 8 Nm.27...29M6×45
Specified torque: 8 Nm.30...35M6×28
Specified torque: 8 Nm.36...38M6×22
Specified torque: 8 Nm.39M8×45
Specified torque: 20 Nm.
Bolt for chain tensioner.
Tighten sump/gearbox bolts to 40 Nm.
Further assembly is basically the reverse of the dismantling procedure.
Install subframe: Running gear, axles, steering - front and four-wheel driveRep. Gr.40Repairing front suspension; Removing and installing subframe
Install poly V-belt → Chapter.
| Threaded connection | Specified torque | |
|---|---|---|
| Engine mounting to subframe | 23 Nm | |
| Gearbox support to gearbox mounting | M10 | 40 Nm |
| Gearbox mounting to subframe | M8 | 25 Nm |
| Bracket for vane pump | M10 | 40 Nm |
| Oil return line from crankcase breather to sump | 30 Nm |
Parts & tools for this job For 1996 Volkswagen Passat
- PARTOil filterSearch: Volkswagen Passat 1996 oil filter
- TOOLOil filter wrenchSearch: oil filter wrench
- FLUIDEngine oilSearch: Volkswagen Passat engine oil
As an Amazon Associate we earn from qualifying purchases.