Workshop Manuals Factory service & repair Volkswagen
01 4-cylinder injection engine (1.8 and 2.0 l engine, chain drive)02 4-cylinder common rail engine (2.0 l, EA189)03 4-cylinder injection engine (2.0 l engine, turbocharger)04 4-cylinder injection engine (1.4 and 1.6 l direct injection)05 4-cylinder injection engine (2.0 l direct injection)06 4-cylinder injection engine (1.4 l direct injection engine, turbocharger)07 4-cylinder common rail engine (1.6 l, EA189)08 4-cylinder diesel engine (1.9 l engine)09 4-cylinder diesel engine (2.0 l engine, 4 valve)10 Fuel supply system - Diesel engines11 Fuel supply system - natural gas engines12 4-cylinder diesel engine (2.0 l engine, 2 valve)13 4-cylinder injection engine (1.6 l roller rocker finger)14 6-cylinder injection engine (direct injection)15 6-cylinder injection engine Volkswagen R GmbH16 4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger)17 7-speed dual clutch gearbox 0AM18 Propshaft and rear final drive19 6-speed automatic gearbox 09M20 6-speed automatic gearbox 09G21 6-speed manual gearbox 02Q22 6-speed manual gearbox 02S23 6-speed dual clutch gearbox 02E24 6-speed manual gearbox 0AJ25 6-speed dual clutch gearbox 02E Volkswagen R GmbH26 5-speed manual gearbox 0A427 6-speed manual gearbox 02S, four-wheel drive28 6-speed manual gearbox 02Q four-wheel drive29 Propshaft and rear final drive Volkswagen R GmbH30 5-speed manual gearbox 0AH31 Wheels and Tyres Guide - Standard32 Brake systems33 Running gear, axles, steering34 Heating, air conditioning35 Heating and air conditioning: Supplementary heater36 Electrical: Communication37 Electrical system38 General body repairs, interior39 General body repairs, exterior
Volkswagen Passat B6 (2005-2010)09 · 4-cylinder diesel engine (2.0 l engine, 4 valve)
09 · Engine

Installing

Make
Volkswagen
Model
Passat B6
Year
2005–2010
Section
Valve gear › Installing
4-cylinder diesel engine (2.0 l engine, 4 valve)Installing

Installing

Note

  • When camshafts are installed, cams for No. 1 cylinder must point upwards.
  • Do not interchange used bearing shells (mark).
  • When installing camshafts, ensure proper seating of retaining lugs in retaining frame and cylinder head.
  • Seal parting surface between retaining frame and cylinder head using silicone adhesive sealant D 176501 A1Fig.
  • Each time work is performed which requires adjustment of the unit injector, the adjustment screw in the rocker arm and also the unit injector ball stud must be renewed.

Sealing parting surfaces of retaining frame
N15-10349

Oil running surfaces of shell bearings.

Install new ball studs into unit injectors.

Install retaining frame and rocker arm shaft.

Evenly tighten bolts (1…20) as shown from inside to outside. Specified torque: 20 Nm

N15-10001

Now tighten rocker arm shaft bolts (1…5)1/4 turn (90°) further.

N23-10001

Screw new adjustment screws into rocker arms hand-tight and fit lock nut.

Install camshaft oil seals → Chapter.

Warning Clean camshaft journal with a cloth and degreasing agent before fitting i.e. brake cleaner. An oiled camshaft journal reduces the friction between components when bolting on. This can cause items to expand and eventually lead to the hub shearing.

Set hubs on camshafts.

Tighten securing bolts (1) for hubs. Torque specification: 100 Nm.

N15-10043

To do this, use counterhold T10051.

Push camshaft pulleys onto hubs.

N15-0275

Note

  • The toothed segment (arrow) of the camshaft toothed belt pulley must be on top.

Hand tighten securing bolts (1) and (2) on camshaft pulleys so that there is no play.

Lock hubs using locking pin for diesel injection pump 3359.

N15-0702

Install toothed belt and adjust valve timing → Chapter.

Fit dial gauge onto adjustment screw of unit injector as shown.

N23-10024

Turn the crankshaft in engine direction of rotation until the roller of the rocker arm is positioned on the peak of the drive cam. Roller side (arrow A) positioned at highest point. Dial gauge (arrow B) positioned at lowest point.

Remove dial gauge.

Now turn adjustment screw into rocker arm until a firm resistance is felt (unit injector positioned at stop).

Turn adjustment screw 180° back off stop.

N23-10101

Hold adjuster screw in this position and tighten lock nut to 30 Nm.

Tighten upper securing bolt (arrow) of bracket for bypass flap and exhaust gas recirculation cooler to 10 Nm.

N15-10161

Install tandem pump → Chapter.

Install cylinder head cover → Chapter.

Note

  • When new rocker fingers have been installed, engine must not be started for about 30 minutes. Hydraulic compensation elements must settle (otherwise valves will strike pistons).

Parts & tools for this job For 2005 Volkswagen Passat

As an Amazon Associate we earn from qualifying purchases.