Workshop Manuals Factory service & repair Volkswagen
01 4-cylinder injection engine (1.8 and 2.0 l engine, chain drive)02 4-cylinder common rail engine (2.0 l, EA189)03 4-cylinder injection engine (2.0 l engine, turbocharger)04 4-cylinder injection engine (1.4 and 1.6 l direct injection)05 4-cylinder injection engine (2.0 l direct injection)06 4-cylinder injection engine (1.4 l direct injection engine, turbocharger)07 4-cylinder common rail engine (1.6 l, EA189)08 4-cylinder diesel engine (1.9 l engine)09 4-cylinder diesel engine (2.0 l engine, 4 valve)10 Fuel supply system - Diesel engines11 Fuel supply system - natural gas engines12 4-cylinder diesel engine (2.0 l engine, 2 valve)13 4-cylinder injection engine (1.6 l roller rocker finger)14 6-cylinder injection engine (direct injection)15 6-cylinder injection engine Volkswagen R GmbH16 4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger)17 7-speed dual clutch gearbox 0AM18 Propshaft and rear final drive19 6-speed automatic gearbox 09M20 6-speed automatic gearbox 09G21 6-speed manual gearbox 02Q22 6-speed manual gearbox 02S23 6-speed dual clutch gearbox 02E24 6-speed manual gearbox 0AJ25 6-speed dual clutch gearbox 02E Volkswagen R GmbH26 5-speed manual gearbox 0A427 6-speed manual gearbox 02S, four-wheel drive28 6-speed manual gearbox 02Q four-wheel drive29 Propshaft and rear final drive Volkswagen R GmbH30 5-speed manual gearbox 0AH31 Wheels and Tyres Guide - Standard32 Brake systems33 Running gear, axles, steering34 Heating, air conditioning35 Heating and air conditioning: Supplementary heater36 Electrical: Communication37 Electrical system38 General body repairs, interior39 General body repairs, exterior
Volkswagen Passat B6 (2005-2010)30 · 5-speed manual gearbox 0AH
30 · Transmission

Bonding roof

Make
Volkswagen
Model
Passat B6
Year
2005–2010
Section
Differential › Bonding roof
5-speed manual gearbox 0AHBonding roof

Bonding roof

Remove roof.

Apply corrosion protection measures Paint workshop manual: Corrosion and corrosion protection, attached and welded parts, materials

Clean bonding areas on roof and vehicle with silicone remover LSE 020 100 A3.

Note

  • The adhesive materials must be applied very quickly.
  • Always observe the application time (pot life).
  • Use pneumatic or electric cartridge guns to apply bonding materials.

Cut approx. 2 mm off nozzle (B) to provide appropriate bead geometry.

N51-10238

Note

  • Following repair sequence must be adhered to in order to ensure correct and long-lasting roof repairs.
  • For this repair, it is absolutely necessary to work with great care to prevent faults during processing.

N51-11719

Apply 1K assembly adhesive D190 MKD A3 to front roof cross member (1) and rear roof cross member (2) in area of factory-fitted bonds using pneumatic cartridge gun V.A.G 1761/1.

N51-11720

In area of roof member, apply 1K assembly adhesive D190 MKD A3(1) using pneumatic cartridge gun V.A.G 1761/1.

Dimension (a) = approx. 12 mm

Dimension (b) = approx. 14 mm

N51-11721

Apply 1K assembly adhesive D190 MKD A3(1) on inner side of roof parallel to left and right roof flange with pneumatic cartridge gun V.A.G 1761/1.

Dimension (a) = approx. 6 mm

Dimension (b) = approx. 14 mm

Note

  • The application time (pot life) of the 2K body adhesive D 180 KD3 A2 is approx. 90 min.
  • An assistant is required for the following work.
  • Remove excessive 2K body adhesive D 180 KD3 A2 from bonding areas immediately. Once cured 2K body adhesive D 180 KD3 A2 can only be removed using mechanical means.

Cut the first step of the static mixer (A) off to achieve the corresponding bead cross-section.

N51-11431

Carefully operate double cartridge gun VAS 5237 without static mixer until adhesive is discharged uniformly from both chambers of cartridge connector.

Screw static mixer onto cartridge connector.

Apply the first 100 mm of adhesive to a piece of cardboard and only then begin to apply the adhesive to the vehicle.

Note

  • Following repair sequence must be adhered to in order to ensure correct and long-lasting roof repairs.
  • For this repair, it is absolutely necessary to work with great care to prevent faults during processing.

N51-11710

Fill area (1) with 2K body adhesive D 180 KD3 A2 using double cartridge gun VAS 5237.

Apply 2K body adhesive D 180 KD3 A2 to areas bonded in factory on roof rear cross member.

N51-11722

Coat roof flanges with 2K body adhesive D 180 KD3 A2(1).

Immediately position and align roof.

Secure roof in area of rear lid aperture and windscreen aperture using vice-grip pliers and secure centre of roof using securing belts Chapter„Adjusting roof depth“.

Check roof depth dimension (a) and adjust if necessary Chapter„Adjusting roof depth“.

Remove excessive 2K body adhesive D 180 KD3 A2 along edge of roof immediately using a cloth soaked in silicone remover LSE 020 100 A3.

Remove excessive 2K body adhesive D 180 KD3 A2 from hinge holes on rear lid aperture.

Note

  • After bonding, vehicle must remain stationary on a level surface for 8 … 10 hours at room temperature (min. 15 °C) so that adhesive can harden.
  • No further work should be performed on the vehicle until the „minimum curing time“ has expired.

Parts & tools for this job For 2005 Volkswagen Passat

As an Amazon Associate we earn from qualifying purchases.