Installing engine
- Make
- Volkswagen
- Model
- Passat B6
- Year
- 2005–2010
- Section
- Removing and installing engine › Installing engine
Installing engine
Installation is carried out in the reverse order. When installing, note the following:
Warning When doing any repair work, especially in the engine compartment, pay attention to the following due to the cramped conditions:
- Route all the various lines and electrical wiring so that they are in their original positions.
- Ensure lines have sufficient clearance to all moving or hot components.
Visually inspect needle bearing in crankshaft. If it is damaged or has turned blue, it must be renewed Rep. gr.13crankshaft group.

If it is not damaged, lightly grease with high-temperature grease G 052 133 A2.
Slightly grease the journal (not the teeth) of the gears as well.
Check for proper seating of both dowel sleeves between engine and gearbox.
When installing engine and gearbox assembly, ensure sufficient clearance to subframe and radiator.
Align engine mountings as follows:
- There must be a distance (a) of at least 10 mm between engine support and longitudinal member (right side).
- The side surface of the engine support (2) should be located parallel to the support arm (1).
- Tighten bolts for engine assembly mounting and engine bracket. Specified torque: 60 Nm + 1/4 turn (90°) further.
- Install pendulum support.

Note
- Specified torques for assembly mountings → Chapter.
Install front exhaust pipes with catalytic convertersChapter.
Install drive shafts Running gear, axles, steeringRep. gr.40Removing and installing drive shafts.
Reinstall heat shield for drive shaft.
Electrical connections and routing Electrical systemRep. gr.97.
Install air conditioner compressor Heating, air conditioningRep. gr.87.
Top up with gearbox oil, if necessary 6-speed dual clutch gearbox 02ERep. gr.34
Reconnect bleeder line (1), vacuum line (2) and fuel pressurisation line (3).

Install poly V-belt → Chapter.
Install noise insulation General body repairs, exteriorRep. gr.50Noise insulation.
Replenish coolant → Chapter.
Connect vehicle diagnosis tester.
Read all event memories and delete all entries which may have been entered due to assembly.
Conduct test drive and generate readiness code vehicle diagnostic tester“Guided Function”.
Then carry out vehicle system test and rectify any faults which have occurred.
Note
- If the event memory was cleared, the readiness code must be generated Vehicle diagnosis tester“Guided functions”.
| Threaded connection | Specified torque | |
|---|---|---|
| Bolts, nuts | M6 | 10 Nm |
| M7 | 15 Nm | |
| M8 | 25 Nm | |
| M10 | 40 Nm | |
| M12 | 60 Nm |
Note
- Specified torques for assembly mountings → Chapter.
Parts & tools for this job For 2005 Volkswagen Passat
- PARTEngine gasket setSearch: Volkswagen Passat 2005 engine gasket set
- TOOLTorque wrenchSearch: 3/8 inch torque wrench
- TOOLFeeler gauge setSearch: feeler gauge set
As an Amazon Associate we earn from qualifying purchases.