Workshop Manuals Factory service & repair Volkswagen
01 4-cylinder injection engine (1.8 and 2.0 l engine, chain drive)02 4-cylinder common rail engine (2.0 l, EA189)03 4-cylinder injection engine (2.0 l engine, turbocharger)04 4-cylinder injection engine (1.4 and 1.6 l direct injection)05 4-cylinder injection engine (2.0 l direct injection)06 4-cylinder injection engine (1.4 l direct injection engine, turbocharger)07 4-cylinder common rail engine (1.6 l, EA189)08 4-cylinder diesel engine (1.9 l engine)09 4-cylinder diesel engine (2.0 l engine, 4 valve)10 Fuel supply system - Diesel engines11 Fuel supply system - natural gas engines12 4-cylinder diesel engine (2.0 l engine, 2 valve)13 4-cylinder injection engine (1.6 l roller rocker finger)14 6-cylinder injection engine (direct injection)15 6-cylinder injection engine Volkswagen R GmbH16 4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger)17 7-speed dual clutch gearbox 0AM18 Propshaft and rear final drive19 6-speed automatic gearbox 09M20 6-speed automatic gearbox 09G21 6-speed manual gearbox 02Q22 6-speed manual gearbox 02S23 6-speed dual clutch gearbox 02E24 6-speed manual gearbox 0AJ25 6-speed dual clutch gearbox 02E Volkswagen R GmbH26 5-speed manual gearbox 0A427 6-speed manual gearbox 02S, four-wheel drive28 6-speed manual gearbox 02Q four-wheel drive29 Propshaft and rear final drive Volkswagen R GmbH30 5-speed manual gearbox 0AH31 Wheels and Tyres Guide - Standard32 Brake systems33 Running gear, axles, steering34 Heating, air conditioning35 Heating and air conditioning: Supplementary heater36 Electrical: Communication37 Electrical system38 General body repairs, interior39 General body repairs, exterior
Volkswagen Passat B6 (2005-2010)15 · 6-cylinder injection engine Volkswagen R GmbH
15 · Engine

Installing engine

Make
Volkswagen
Model
Passat B6
Year
2005–2010
Section
Removing and installing engine › Installing engine
6-cylinder injection engine Volkswagen R GmbHInstalling engine

Installing engine

Running gear, axles, steering

Installation is carried out in the reverse order. When installing, note the following:

Warning When doing any repair work, especially in the engine compartment, pay attention to the following due to the cramped conditions:

  • Route all the various lines and electrical wiring so that they are in their original positions.
  • Ensure lines have sufficient clearance to all moving or hot components.

Visually inspect needle bearing in crankshaft. If it is damaged or has turned blue, it must be renewed Rep. gr.13crankshaft group.

N34-10729

If it is not damaged, lightly grease with high-temperature grease G 052 133 A2.

Slightly grease the journal (not the teeth) of the gears as well.

Check for proper seating of both dowel sleeves between engine and gearbox.

When installing engine and gearbox assembly, ensure sufficient clearance to subframe and radiator.

Align engine mountings as follows:

  • There must be a distance (a) of at least 10 mm between engine support and longitudinal member (right side).
  • The side surface of the engine support (2) should be located parallel to the support arm (1).
  • A10-1661
  • Tighten bolts for engine assembly mounting and engine bracket. Specified torque: 60 Nm + 1/4 turn (90°) further.
  • Install pendulum support.

Note

Install front exhaust pipes with catalytic convertersChapter.

Install drive shafts Running gear, axles, steeringRep. gr.40Removing and installing drive shafts.

Reinstall heat shield for drive shaft.

Electrical connections and routing Electrical systemRep. gr.97.

Install air conditioner compressor Heating, air conditioningRep. gr.87.

Top up with gearbox oil, if necessary 6-speed dual clutch gearbox 02ERep. gr.34

Reconnect bleeder line (1), vacuum line (2) and fuel pressurisation line (3).

A20-1121

Install poly V-belt → Chapter.

Install noise insulation General body repairs, exteriorRep. gr.50Noise insulation.

Replenish coolant → Chapter.

Connect vehicle diagnosis tester.

Read all event memories and delete all entries which may have been entered due to assembly.

Conduct test drive and generate readiness code vehicle diagnostic tester“Guided Function”.

Then carry out vehicle system test and rectify any faults which have occurred.

Note

  • If the event memory was cleared, the readiness code must be generated Vehicle diagnosis tester“Guided functions”.

Specified torques

Threaded connectionSpecified torque
Bolts, nutsM610 Nm
M715 Nm
M825 Nm
M1040 Nm
M1260 Nm

Note

Parts & tools for this job For 2005 Volkswagen Passat

As an Amazon Associate we earn from qualifying purchases.