Installing gearbox
- Make
- Volkswagen
- Model
- Passat B6
- Year
- 2005–2010
- Section
- Removing and installing gearbox › Installing gearbox
Installing gearbox
Install in reverse order of removal. Nevertheless, important steps are listed here:
Renew needle bearing (arrow) in crankshaft Rep. gr.13Crankshaft; Renewing needle bearing in crankshaft.

Lightly grease journal and splines on gearbox using high-temperature grease G052133A2.
Check for proper seating of both dowel sleeves between engine and gearbox.
Check for proper seating of intermediate plate.
If this is not so, then »something is wrong«!
Readjust gearbox support until engine and gearbox are »aligned with each other«.
Cable must not be greased!
Securing clips (arrows) for selector lever cable must be renewed.

Check and adjust selector lever cable → Chapter.
Check coolant level and top up if necessary Rep. gr.19.
Checking oil level and topping up → Chapter
Parts & tools for this job For 2005 Volkswagen Passat
- PARTClutch kitSearch: Volkswagen Passat 2005 clutch kit
- TOOLClutch alignment toolSearch: clutch alignment tool
- FLUIDGear oilSearch: Volkswagen Passat manual gearbox oil
As an Amazon Associate we earn from qualifying purchases.