Workshop Manuals Factory service & repair Volkswagen
01 4-cylinder injection engine (1.8 and 2.0 l engine, chain drive)02 4-cylinder common rail engine (2.0 l, EA189)03 4-cylinder injection engine (2.0 l engine, turbocharger)04 4-cylinder injection engine (1.4 and 1.6 l direct injection)05 4-cylinder injection engine (2.0 l direct injection)06 4-cylinder injection engine (1.4 l direct injection engine, turbocharger)07 4-cylinder common rail engine (1.6 l, EA189)08 4-cylinder diesel engine (1.9 l engine)09 4-cylinder diesel engine (2.0 l engine, 4 valve)10 Fuel supply system - Diesel engines11 Fuel supply system - natural gas engines12 4-cylinder diesel engine (2.0 l engine, 2 valve)13 4-cylinder injection engine (1.6 l roller rocker finger)14 6-cylinder injection engine (direct injection)15 6-cylinder injection engine Volkswagen R GmbH16 4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger)17 7-speed dual clutch gearbox 0AM18 Propshaft and rear final drive19 6-speed automatic gearbox 09M20 6-speed automatic gearbox 09G21 6-speed manual gearbox 02Q22 6-speed manual gearbox 02S23 6-speed dual clutch gearbox 02E24 6-speed manual gearbox 0AJ25 6-speed dual clutch gearbox 02E Volkswagen R GmbH26 5-speed manual gearbox 0A427 6-speed manual gearbox 02S, four-wheel drive28 6-speed manual gearbox 02Q four-wheel drive29 Propshaft and rear final drive Volkswagen R GmbH30 5-speed manual gearbox 0AH31 Wheels and Tyres Guide - Standard32 Brake systems33 Running gear, axles, steering34 Heating, air conditioning35 Heating and air conditioning: Supplementary heater36 Electrical: Communication37 Electrical system38 General body repairs, interior39 General body repairs, exterior
Volkswagen Passat B6 (2005-2010)22 · 6-speed manual gearbox 02S
22 · Transmission

Installing gearbox

Make
Volkswagen
Model
Passat B6
Year
2005–2010
Section
Removing and installing gearbox › Installing gearbox
6-speed manual gearbox 02SInstalling gearbox

Installing gearbox

Running gear, axles, steering

Note

  • Refer to procedure “Removing gearbox” for required special tools → Chapter.

Observe the following table on the subject of “checking and topping up gear oil”.

“Checking and topping up gear oil”
»No«»Yes«»Yes«
GearboxOriginal partX
No oil lossX
Completely dismantledX
Before installation Item
Oil capacity → Chapter
Partially dismantled(Gearbox housing and clutch housing were not separated.)X
After installation → Chapter

All threaded holes into which self-locking bolts are to be screwed must be cleaned of residual locking fluid carefully with a thread tap.

Always renew self-locking bolts and nuts.

Check whether dowel sleeves for aligning engine and gearbox are fitted in cylinder block and install if necessary.

If dowel sleeves are not fitted, difficulties shifting gears, clutch problems and possible noises from the gearbox (rattling of gears which are not engaged) could occur.

Ensure that intermediate plate is correctly seated on engine.

Clean input shaft splines and apply thin coat of grease for clutch plate splines G 000 100.

The clutch plate must slide easily to and fro on the input shaft.

Gearbox support 3282 is aligned with adjustment plate 3282/39 for installation of gearbox.

N34-1850

Align arms of gearbox support according to holes in adjustment plate.

Screw in support elements(A ) and (C) (pin 3282/29) on adjustment plate as shown.

Place gearbox on engine and gearbox jack.

Align adjustment plate and gearbox parallel to one another.

Screw pin 3282/29 into rear hole in gearbox for securing bolt of pendulum support.

N34-1851

Note

  • Be careful of all lines when installing gearbox.

Position engine and gearbox jack under vehicle. (Arrow B) on adjustment plate points in direction of vehicle travel.

Tilt gearbox further using spindles of gearbox support 3282.

Differential must face upwards.Swing gearbox down near 6th gear.

Then carefully raise gearbox.

Guide gearbox with differential over subframe (A)(in direction of arrow).

Observe longitudinal member (B).

N34-11129

If necessary, have a second mechanic push engine forwards slightly.

Guide gearbox with differential over subframe (A), to do this swing gearbox up near 6th gear.

N34-11128
The right flange shaft (1) must be guided past the notch (arrow) in the intermediate plate.
N34-11127

Align gearbox to engine and join.

Screw in lower engine/gearbox securing bolts and tighten to specified torque → Chapter.

After gearbox has been bolted to engine, remove engine and gearbox jack from gearbox.

If small cover plate (A) had been installed behind the right flange shaft (arrows), install it.

V34-2439

Screw in upper engine/gearbox securing bolts and tighten to specified torque. Chapter

Install bracket (A) on gearbox using new hexagonal bolts (arrows) and tighten to specified torque → Chapter.

N34-1847

Align engine and gearbox in installation position. To do this, lift until gearbox is fully in contact with left engine/gearbox mounting.

Install new bolts (arrows) for left assembly mounting in gearbox mounting and tighten to specified torque → Chapter.

N34-1846

Note

  • Install engine and gearbox mounting free of tension Rep. gr.10Removing and installing engine.

Warning Do not remove support bar 10-222 A until all bolts securing the left and right assembly mountings have been tightened to specified torque.

Install pendulum support Running gear, axles, steeringRep. gr.40Assembly overview - Subframe, anti-roll bar, suspension links.

N34-10973

Then install drive shafts Running gear, axles, steeringRep. gr.40Removing and installing drive shafts.

N34-11369

Install drive shaft heat shield, if present (arrows)Running gear, axles, steeringRep. gr.40Repairing drive shafts; Removing and installing drive shafts.

If present, fit front vehicle level sender G78(arrows). Rep. gr.40 Removing and installing front vehicle level sender G78.

N34-11241

Attach connector (1) to oil level and oil temperature sender G266.

N34-10504

Assemble exhaust system and attach exhaust system bracket to subframe Rep. gr.26Exhaust system.

Passat CC and CC

N19-10337

Bolt charge air pipe to engine Rep. gr.21Charge air system with turbocharger.

Continuation for all

Install left charge air hose (1)Rep. gr.21Charge air system with turbocharger.

Install slave cylinder and tighten bolts (arrows B) to specified torque Item.

N34-1844

Then install gearbox support (arrow A) and tighten to specified torque → Chapter.

Push connector (1) onto reversing light switch F4.

N34-1845

Install starter, push on connector (arrow 2) and bolt on wire (arrow 3)Electrical systemRep. gr.27Starter.

Attach earth strap to top starter bolt.

Check for correct installation position of vacuum hose for brake system, install vacuum hose if necessary Rep. gr.47.

Attach support (B) to gearbox.

N34-11109

Press pipe/hose line (A) into retainer (B) on gearbox.

Install cable support bracket on gearbox and tighten bolts (arrows) to specified torque Item.

Passat 2011 ►

N34-11267

Install gearbox selector lever (A)Fig..

Tighten hexagon nut (arrow 3) to specified torque Item.

Spread a small amount of grease on pin of gearbox selector lever (A).

Allocate grease using Electronic parts catalogue (ETKA).

Connect gear selector cable to gearbox selector lever.

Renew securing clip (arrow 2) each time it is removed.

Install relay lever together with cable end-piece → Chapter.

Clip (arrow 1) secures relay leverEnsure proper engagement of clip.

Connect gate selector cable to cable end-piece.

Passat CC and CC

N34-11108

Install gearbox selector lever (A)Fig..

Tighten hexagon nut (arrow 3) to specified torque Item.

Spread a small amount of grease on pin of gearbox selector lever (A).

Allocate grease using Electronic parts catalogue (ETKA).

Connect gear selector cable to gearbox selector lever.

Renew securing clip (1) each time it is removed.

Insert relay lever together with cable end-piece.

Catch (arrow 2) secures relay lever.Ensure proper engagement.

From around 06.08, relay lever is secured with a clip ⇒ previous figure.

Ensure proper engagement of clip.

Connect gate selector cable to cable end-piece.

Continuation for all

Adjust selector mechanism → Chapter.

Install battery tray, battery and battery cover Electrical systemRep. gr.27Battery; Removing and installing battery.

Install engine cover Rep. gr.23 or air filter Rep. gr.24.

Set both foam pieces on upper edge of left and right wings Body, frontRep. gr.50.

Reconnect battery and perform work required after connecting battery Electrical systemRep. gr.27Disconnecting and connecting battery.

Install lower part of front left wheel housing liner General body repairs, exteriorRep. gr.66Wheel housing liner.

Install noise insulation General body repairs, exteriorRep. gr.50Noise insulation.

For vehicles with front vehicle level sender G78, check headlight adjustment Electrical systemRep. gr.94Lights, lamps, switches - exterior.

Parts & tools for this job For 2005 Volkswagen Passat

As an Amazon Associate we earn from qualifying purchases.