Workshop Manuals Factory service & repair Volkswagen
01 4-cyl. direct injection engine (1.8 l and 2.0 l 4V turbocharger, chain drive)02 6-cylinder direct-injection engine (3.6 l engine, 4V)03 Fuel supply system - Petrol engines04 Fuel supply system - Diesel engines05 4-cylinder common rail engine (2.0 l, EA189 Gen II)06 4-cylinder injection engine (1.4 l direct injection engine, turbocharger)07 4-cylinder injection engine (1.4 l direct injection engine, turbocharger and supercharger)08 4-cylinder common rail engine (1.6 l, EA189)09 Fuel supply system - natural gas engines10 4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger)11 Propshaft and rear final drive12 7-speed dual clutch gearbox 0AM13 6-speed manual gearbox 02Q, 0BB and 0FB14 6-speed dual clutch gearbox 02E15 6-speed manual gearbox 02S16 6-speed manual gearbox 0AJ17 Brake systems18 Running gear, axles, steering19 Wheels and Tyres Guide20 Heating, air conditioning21 Heating and air conditioning: Auxiliary heater22 Electrical system23 Electrical: Communication24 General body repairs, interior25 General body repairs, exterior26 Vehicle-specific paint information
Volkswagen Passat B7 (2010-2015)10 · 4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger)
10 · Engine

Assembly overview - turbocharger

Make
Volkswagen
Model
Passat B7
Year
2010–2015
Section
Turbocharger › Assembly overview - turbocharger
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger)Assembly overview - turbocharger

Assembly overview - turbocharger

Parts l and ll

N21-10237

Part 1

N21-10077
  • Charge pressure control solenoid valve N75
  • Bolt
    10 Nm
  • Bolt
    7 Nm
  • Turbocharger air recirculation valve N249
    To remove, pressure pipe must be removed Anchor.
  • O-ring
    Renew if damaged.
  • Turbocharger
    Removing and installing Chapter“Removing and installing turbocharger”.
    Checking turbocharger vacuum unit Chapter“Checking vacuum unit for turbocharger”.
    Removing and installing vacuum unit for turbocharger Chapter“Renewing vacuum unit for turbocharger”.
    Adjusting vacuum unit for turbocharger Chapter“Adjusting vacuum unit for turbocharger”.
  • Connecting hose
  • Connecting hose

Part II

N21-10238
  • Bolt
    8 Nm
  • Coolant pipe
  • O-ring
    Renew
  • Stud
    20 Nm
  • Turbocharger
    Removing and installing Chapter“Removing and installing turbocharger”.
    Checking turbocharger vacuum unit Chapter“Checking vacuum unit for turbocharger”.
    Removing and installing vacuum unit for turbocharger Chapter“Renewing vacuum unit for turbocharger”.
    Adjusting vacuum unit for turbocharger Chapter“Adjusting vacuum unit for turbocharger”.
  • Gasket
    Renew
  • Nut
    Renew studs and fastening nuts.
    Screw studs into cylinder head until they project only by 25 mm.
    Coat studs with high-temperature paste.
    Observe tightening sequence and specified torques: items (A) to (I).
    25 Nm
  • Coolant pipe
  • Gasket
    Renew
  • Bolt
    8 Nm
  • Oil return pipe
    To remove, catalytic converter needs to be removed
  • Banjo bolt
    Secured to valve timing housing.
    20 Nm
  • Seal
    Renew.
  • Oil supply pipeCautionOil supply line must be renewed when installing a new turbocharger.
  • Banjo bolt
    30 Nm

Parts & tools for this job For 2010 Volkswagen Passat

As an Amazon Associate we earn from qualifying purchases.