Workshop Manuals Factory service & repair Volkswagen
01 4-cyl. direct injection engine (1.8 l and 2.0 l 4V turbocharger, chain drive)02 6-cylinder direct-injection engine (3.6 l engine, 4V)03 Fuel supply system - Petrol engines04 Fuel supply system - Diesel engines05 4-cylinder common rail engine (2.0 l, EA189 Gen II)06 4-cylinder injection engine (1.4 l direct injection engine, turbocharger)07 4-cylinder injection engine (1.4 l direct injection engine, turbocharger and supercharger)08 4-cylinder common rail engine (1.6 l, EA189)09 Fuel supply system - natural gas engines10 4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger)11 Propshaft and rear final drive12 7-speed dual clutch gearbox 0AM13 6-speed manual gearbox 02Q, 0BB and 0FB14 6-speed dual clutch gearbox 02E15 6-speed manual gearbox 02S16 6-speed manual gearbox 0AJ17 Brake systems18 Running gear, axles, steering19 Wheels and Tyres Guide20 Heating, air conditioning21 Heating and air conditioning: Auxiliary heater22 Electrical system23 Electrical: Communication24 General body repairs, interior25 General body repairs, exterior26 Vehicle-specific paint information
Volkswagen Passat B7 (2010-2015)18 · Running gear, axles, steering
18 · Steering & suspension

Repairing subframe, front-wheel drive

Make
Volkswagen
Model
Passat B7
Year
2010–2015
Section
Subframe › Repairing subframe, front-wheel drive
Running gear, axles, steeringRepairing subframe, front-wheel drive

Repairing subframe, front-wheel drive

Brake systems

W42-10016
Special tools and workshop equipment requiredTensioning strap T10038Locating pins T10096Engine and gearbox jack V.A.G 1383 AHydraulic press VAS 6178 and thrust piece T10205/13Foot pump VAS 6179
Assembly tool T10356
W00-10491

Pressing out front bonded rubber bush Anchor

Pressing in front bonded rubber bush Anchor

Pressing out rear bonded rubber bush Anchor

Pressing in rear bonded rubber bush Anchor

Pressing out front bonded rubber bush

Loosen wheel bolts.

Raise vehicle.

Remove rear wheels.

Remove coil springs → Chapter.

Disconnect electrical connections between rear axle and body.

Remove anti-roll bar → Chapter.

BlueMotion vehicles

N42-10508

Remove cover (1).

Continuation for all vehicles

Use tensioning straps T10038 to strap vehicle to support beams of lifting platform on both sides.

N42-10224

Warning If the vehicle is not strapped down, there is a great danger that the vehicle will slip off the lifting platform!

Position engine and gearbox jack V.A.G 1383 A underneath subframe and secure with tensioning strap.

A42-10022

Unscrew one hexagon bolt (1) on both sides.

N42-10257

Note

  • Only the right side of vehicle is shown to improve clarity.

To fix position of subframe, locating pins T10096 must be screwed in successively at positions (1) on both sides of vehicle.

Secure position of subframe with locating pins T10096.

N42-10258

Note

  • The locating pins T10096 may be tightened only to a maximum of 20 Nm; otherwise the threads of the locating pins may be damaged.

Replace securing bolts on subframe with locating pins T10096 one after the other on both sides of the vehicle and tighten to 20 Nm.

The position of the subframe is now fixed.

Lower subframe approx. 10 cm with engine and gearbox jack V.A.G 1383 A.

Fit tools as shown in illustration.

N42-10261
1Nut T10263/52Thrust piece T10356/13Subframe4Tube T10356/25Hydraulic press VAS 6178 and thrust piece T10205/136Nut T10263/57Spindle T10263/4

Take up play in special tools.

Press out bonded rubber bush.

Note

  • The outer ring of the bush shears off when the bonded rubber bush is pulled out. This occurs with a loud bang.
  • After the bush has been pulled out, it must be removed from the tube T10356/2 with light hammer blows.

Pressing in front bonded rubber bush

Set up special tools with bonded rubber bush on subframe as shown.

N42-10262
1Nut T10263/52Guide piece T10356/3 with side A towards subframe3Subframe4Bonded rubber bush5Thrust piece T10356/4 with side A towards bonded rubber bush6Tube T10356/27Hydraulic press VAS 6178 and thrust piece T10205/138Nut T10263/59Spindle T10263/4

Take up play in special tools and bonded rubber bush.

Operate pump to press bonded rubber bush in until collar lies »flush« on subframe.

Pressing out rear bonded rubber bush

Loosen wheel bolts.

Raise vehicle.

Remove rear wheels.

Remove coil springs → Chapter.

Disconnect electrical connections between rear axle and body.

Remove anti-roll bar → Chapter.

BlueMotion vehicles

N42-10508

Remove cover (1).

Continuation for all vehicles

Use tensioning straps T10038 to strap vehicle to support beams of lifting platform on both sides.

N42-10224

Warning If the vehicle is not strapped down, there is a great danger that the vehicle will slip off the lifting platform!

Position engine and gearbox jack V.A.G 1383 A underneath subframe and secure with tensioning strap.

A42-10022

Natural gas vehicles

Remove fuel tanks 1 and 2 (natural gas) Rep. gr.20Fuel tank; Removing and installing fuel tank.

Continuation for all vehicles

Unscrew one hexagon bolt (2) on both sides.

N42-10257

Note

  • Only the right side of vehicle is shown to improve clarity.

To fix position of subframe, locating pins T10096 must be screwed in successively at positions (2) on both sides of vehicle.

Secure position of subframe with locating pins T10096.

N42-10258

Note

  • The locating pins T10096 may be tightened only to a maximum of 20 Nm; otherwise the threads of the locating pins may be damaged.

Replace securing bolts on subframe with locating pins T10096 one after the other on both sides of the vehicle and tighten to 20 Nm.

The position of the subframe is now fixed.

Lower subframe approx. 10 cm with engine and gearbox jack V.A.G 1383 A.

Fit tools as shown in illustration.

N42-10263
1Nut T10263/52Thrust piece T10356/53Subframe4Tube T10356/65Hydraulic press VAS 6178 and thrust piece T10205/136Nut T10263/57Spindle T10263/4

Take up play in special tools.

Press out bonded rubber bush.

Note

  • The outer ring of the bush shears off when the bonded rubber bush is pulled out. This occurs with a loud bang.
  • After the bush has been pulled out, it must be removed from the tube T10356/2 with light hammer blows.

Pressing in rear bonded rubber bush

Set up special tools with bonded rubber bush on subframe as shown.

N42-10264
1Nut T10263/52Guide piece T10356/3 with side B towards subframe3Subframe4Bonded rubber bush5Thrust piece T10356/4 with side B towards bonded rubber bush6Hydraulic press VAS 6178 and thrust piece T10205/137Nut T10263/58Spindle T10263/4

Take up play in special tools and bonded rubber bush.

Operate pump to press bonded rubber bush in until collar lies »flush« on subframe.

Continue installation in reverse order. Note the following points:

Bleed brake system Brake systemsRep. gr.47Hydraulic system.

Fit wheels, torque setting → Chapter.

Specified torques

ComponentSpecified torque
Subframe to bodyUse new bolts90 Nm + 90° further

Parts & tools for this job For 2010 Volkswagen Passat

As an Amazon Associate we earn from qualifying purchases.