Removing and installing turbocharger
- Make
- Volkswagen
- Model
- Passat B8
- Year
- 2014–2023
- Section
- Turbocharger › Removing and installing turbocharger
Removing and installing turbocharger
Special tools and workshop equipment requiredEngine bung set VAS 6122

Note
- Fit all heat shield sleeves in the same place when installing.
When a mechanical fault is found on the turbocharger, e.g. a destroyed compressor impeller, it is not only sufficient to renew the turbocharger. To avoid subsequent damage, the following work must be carried out:
- Check air filter housing, air filter element and intake hoses for dirt/soiling.
- Check the whole charge air path and charge air cooler for foreign objects.
- If foreign objects are found in the charge air system, the charged air routing must be cleaned and the charge air cooler must be renewed if necessary.
Remove engine cover panel → Chapter.
Remove noise insulation General body repairs, exteriorRep. gr.66Noise insulation; Removing and installing noise insulation.
Remove coolant pump for high-voltage battery V590 to free up space Anchor.

Unscrew centre hex studs (arrows), and remove heat shield for right drive shaft.

Remove heat-shield sleeve.

Disconnect electrical connector (arrow) on oil pressure switch F22.
Remove bolts (arrows) and detach oil supply line (1) and oil return line (2).

Seal off open lines and connections with clean plugs from engine bung set VAS 6122.
Unscrew bolt (2) and remove screw-type clip.

Unscrew nuts (1, 4) and attach catalytic converter to vehicle.
Note
- Disregard (item 3).
Loosen hose clips (1, 2) and remove air pipe.

Remove air pipe → Chapter.
Unscrew bolts (arrows), and detach crankcase breather hose (1).

Disconnect connector (2) at charge pressure positioner V465.

Unscrew bolts (arrows), remove connection (1), and lay it to one side.
Remove bolts (arrows) and pivot coolant lines (1) to right side.

Remove electrical connector (1) for Lambda probe 1 before catalytic converter GX10 from retainers, release and pull off.

Unclip electrical wire and lay aside.
Note
- Disregard (item 2).
Unscrew bolts (arrows) then remove bracket with heat shield (2) and bracket (1) for engine cover panel.

Guide out electrical wire for Lambda probe 1 before catalytic converter GX10.
Unscrew nuts (arrows) and remove turbocharger.

Insert screwdriver (2) into groove (arrow) on turbocharger, and lever out seal (1).

Installation is carried out in the reverse order; note the following:
Note
- Renew seals and O-rings.
- Fill turbocharger with engine oil at connection for oil supply line.
- Secure all hose connections with hose clips meeting production standard Electronic Parts Catalogue.
- After installing turbocharger, run engine for about 1 minute at idling speed to ensure that oil is supplied to turbocharger.
Electrical connections and routing Current flow diagrams, Electrical fault finding and Fitting locations.
Check coolant level and top up if necessary Anchor.
- Chapter“Assembly overview - turbocharger”
- Chapter“Assembly overview - charge-air hose connections”
- Fig.“Installing catalytic converter - tightening torque and sequence”
- General body repairs, exteriorRep. gr.66Noise insulation; Assembly overview - noise insulation.
Parts & tools for this job For 2014 Volkswagen Passat
- PARTEngine gasket setSearch: Volkswagen Passat 2014 engine gasket set
- TOOLTorque wrenchSearch: 3/8 inch torque wrench
- TOOLFeeler gauge setSearch: feeler gauge set
As an Amazon Associate we earn from qualifying purchases.